Sterling Wheelchair AF-XXX Manual Do Utilizador

Página de 55
Additive Feeders 
Chapter 6: Maintenance 
39 of 55 
Chapter 6:  Maintenance 
6-1  Preventative Maintenance Schedule 
The checklist below contains a list of items which should be inspected and/or replaced to 
keep your Additive Feeder operating at peak efficiency.  Perform each inspection at the 
regular intervals listed below. 
 
System model # 
 
Serial # 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect auger, 
sleeve and hopper 
throat.  Clean if 
dirty. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month 
Jan  Feb  Mar  Apr  May
Jun
Jul 
Aug
Sep  Oct  Nov
Dec
Lock out electrical 
power and inspect 
electrical wiring for 
integrity. 
 
 
 
 
 
 
 
 
 
 
 
 
Visually inspect the 
operation of motor 
and auger while it 
is operating. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
- Photocopy this page for your maintenance records -