Mitsubishi Electronics Mitsubishi Digital Electronics Water System QJ71DN91 Manual Do Utilizador

Página de 150
4 - 10                                                                                                                                                       4 - 10
MELSEC-Q
4   SETUP AND PROCEDURES BEFORE OPERATION
4.6 Communication Test
The transmission test and reception test are performed by connecting the QJ71DN91
and other DeviceNet devices with a communication cable. There is no restriction on
the node number setting of the communication counterpart.
Execute the test in the following sequence:
Start
Connect the QJ71DN91 and the DeviceNet 
station of the communication counterpart 
with a DeviceNet cable.
Check 
the QJ71DN91's LEDs
Abnormal completion
See buffer memory address 62F
H
"hardware test result storage area."
Match the communication speed of the 
QJ71DN91 with that of the DeviceNet station 
of the communication counterpart. 
(Set the mode switch between A and C.)
Turn ON the power of the network and the 
power of the DeviceNet station of the 
communication counterpart.
Normal completion
Turn ON the power of the QJ71DN91. 
(The MS LED flashes in green.)
The MS LED illuminates in green.
The MS LED goes off and 
the ERR. LED illuminates.
[LED display]
QJ71DN91
RUN
MS
NS
ERR.
QJ71DN91
RUN
MS
NS
ERR.
QJ71DN91
RUN
MS
NS
ERR.
Performing communication test 
Normal completion
Abnormal completion
Flashes the MS LED.
Turns OFF the MS LED goes off.
Turns ON the ERR. LED illuminates.
Illuminates the MS LED in green.
Turns OFF the ERR. LED goes off.