Monogram ZEU30RSJSS Instrução De Instalação

Página de 16
8
Installation Instructions
1
 
PRE-TEST CHECKLIST
  Remove all protective film, if present, and any 
stickers.
  Check to be sure that all wiring is secure and 
not pinched or in contact with moving parts.
  Check level of appliance.
  Check that the cooktop is properly grounded.
CHECKLISTS
2
 
OPERATION CHECKLIST
  Remove all items from the top of the cooktop 
surface.
  Turn on the power to the cooktop.(Refer to 
your Owner’s Manual.) Verify that all surface 
burners operate properly.
  Check that the circuit breaker is not tripped 
nor the house fuse blown.
  Check that conduit is securely connected to 
the junction box.
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are 
UL recognized for connections to larger gauge 
household wiring. The insulation of these leads 
is rated at temperatures much higher than 
the temperature rating of household wiring. 
The current carrying capacity of a conductor 
is governed by the wire gauge and also the 
temperature rating of the insulation around the 
wire.
NOTE: ALUMINUM WIRING
• WARNING: 
IMPROPER CONNECTION OF ALUMINUM 
HOUSE WIRING TO THE COPPER LEADS CAN 
RESULT IN A SERIOUS PROBLEM.
•  Splice copper wires to aluminum wiring 
using special connectors designed and UL 
approved for joining copper to aluminum 
and follow the manufacturer’s recommended 
connector procedure closely.
NOTE: Wire used, location and enclosure of 
splices, etc., must conform to good wiring 
practice and local codes.