Monogram ZV48RSFSS Instrução De Instalação

Página de 16
8
Installation Preparation
REMOVE THE PACKAGING
• Remove packages from the “V” shaped cardboard
section. Remove shipping pads.
• Lift the hood out of the box.
IMPORTANT:
 Lift the hood by grasping
the outside edges of the exhaust opening on the top.
• The vent hood motor is shipped secured to the skid with
4 screws. Locate and remove 2 screws on each side of the
motor. Discard the shipping skid and screws.
• Grease filters must be removed. Grasp the latch, pull
the filter up and lift out.
Hood
Parts
Wood
Mounting
Support
Motor
Mounted
on Skid
Shipping Carton
Duct
Transition
• From the inside of the hood, loosen (do not remove)
the 2 screws holding the wood mounting support to
the back of the hood. The screws should be backed
out of the wood to 1/4". Remove and set aside the
mounting support with screws for later installation.
DO NOT DISCARD.
• Remove tape and packing material from the hood and
all supplied parts.
• Lift to remove the grease trays. Set grease filters and
trays aside for later installation. DO NOT DISCARD.
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Pliers
Electric or battery operated drill
and 1/8", 3/8" bits
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
Key Hole Saw
Hammer
Wire cutter/stripper
Step ladder
Metal Snips
Saber saw
or Sawsall
Wire nuts
Phillips and flat
blade
screwdrdivers
Strain relief for
junction cover.
Spirit level
1/4" pivoting
hex socket
Flashlight
Safety glasses
10" round metal
duct, length to
suit installation.
Duct tape