Vigo Industries VGT846 Guia De Especificação

Página de 5
3
Installation must be done by a qualified licensed plumber.
Prior to installation please read the instructions thoroughly, confirm that all
parts are included and visually inspect the unit for any defects.
If you have any questions please contact the Vigo Technical Support
Department before proceeding with installation.
Your new faucet is designed for years of trouble-free performance.
Keep it looking new by cleaning it periodically with a soft cloth. Avoid abrasive
cleaners, steel wool and harsh chemicals as these will scratch, dull, and/or damage
the finish and/or product void your warranty.
Be sure to shut off water supply prior to installation.
Protect your eyes with safety glasses when cutting or soldering water
supply lines
Cover your drain to avoid losing parts.
Prior to beginning installation, turn off the cold and hot water lines and open the hot
and cold knobs on the old faucet to release build-up pressure.
When installing your new faucet, turn the connector nuts finger-tight, then use one
wrench to anchor the fitting and a second wrench to tighten the nut one additional
turn. Connections that are too tight will reduce the integrity of the system.
Wrap all threaded connections with Teflon tape available at your local hardware or
plumbing supply store. Always wrap in a clockwise direction.
All installations can vary depending on how your previous faucet was installed. Not
all necessary supplies to install your faucet are included, however, they are
available wherever plumbing supplies are sold.
Adjustable wrench
Groove joint pliers
Plumber's putty
Pipe tape
Phillips and flat screwdrivers
MAINTENANCE
REQUIRED TOOLS
IMPORTANT POINTS
SAFETY TIPS
INSTALLATION
PACKAGE CONTENTS
FAUCET ASSEMBLY
SPOUT
FRONT COVER
ALLEN
KEY
ASSEMBLY
1.  SHUT OFF WATER SUPPLY.
REMOVE THE OLD FAUCET AND
FLEXIBLE HOSES. CLEAN SINK
SURFACE IN PREPARATION FOR
THE NEW FAUCET.
3. SECURE THE FAUCET BASE TO
THE COLD AND HOT WATER PIPE
LINES.
9. AFTER INSTALLATION IS COMPLETE,
TURN ON THE WATER SUPPLY VALVES AND
ALLOW BOTH HOT AND COLD WATER TO
RUN AT LEAST ONE MINUTE EACH. WHILE
WATER IS RUNNING, CHECK FOR LEAKS,
ESPECIALLY AT HOOK-UPS TO SUPPLY
LINES. TIGHTENING NUTS SLIGHTLY WILL
STOP ANY MINOR LEAKS.
NOTE: INSTALLATION MUST BE
DONE BY A QUALIFIED, LICENSED
PLUMBER.
FRONT
COVER
7. SCREW THE SPOUT TO THE
FAUCET.  YOU MAY CHOOSE TO USE
PIPE TAPE.
8. PLACE COLD AND HOT WATER
HANDLES TO THE FAUCET AND
TIGHTEN THE HEX SCREW.
5.  CLOSE THE WALL WITH THE
SHEETROCK AND CERAMIC TILES
AROUND EXPOSED HANDLE
CARTRIDGES LEAVING ENOUGH
SPACE TO THREAD THE HANDLE
COVERS INTO PLACE. PLACE THE
FRONT COVER TO THE FAUCET
BASE AND THREAD ON THE
HANDLE COVERS UNTIL SECURE.
SHEETROCK
TOP VIEW
HANDLE
COVER
SPOUT
HEX
SCREW
6. PLACE HANDLES TO THE FAUCET
AND TIGHTEN THE HEX SCREWS.
HEX SCREW
TOP VIEW
2. UNSCREW HEX SCREW FROM THE
FAUCET BASE. REMOVE HANDLE
AND HANDLE COVER FROM THE
FAUCET.
1
2
6
5
7
3
SHEETROCK
4.  IT IS IMPERATIVE THAT THE LICENSED CONTRACTOR MEASURE THE
THICKNESS OF THE SHEETROCK USED, TILE USED AND ADDED ACCENTS TO
MAKE SURE THAT WHEN THE WALL IS FULLY CLOSED THAT THE HOT AND
COLD CONTROLS ARE SET TO THE CORRECT DEPTH IN THE WALL TO
FUNCTION UP TO THE DESIRED NEEDS.
!
HANDLE
CARTRIDGES
NOTE: THERE ARE TWO SETS OF HEX
SCREWS, ONE SET TO ADJUST THE
HANDLE TO MAKE SURE IT SITS
HORIZONTALLY LEVEL AND ONE SET
TO SECURE THE HANDLES TO THE
BODY.