Prepare the Countertop
Cut out the countertop per the dimensions shown in 
“Cabinet Requirements” on page 3.
Some solid surface materials, such as Surell™ and 
Corian®, require different cutting methods. Consult with the 
solid surface manufacturer for the correct cutting method 
needed. Apply heat reflective tape such as Scotch 
Aluminum Foil Tape #425 or #427 (not included) around 
the cutout so that it folds over on the top and sides. Do not 
wrap the tape underneath the cooktop. Be sure the tape 
extends beyond the outermost flange of the cooktop. All 
corners should be covered with tape. 
Seal the Cooktop with Foam Tape
Apply the self adhesive foam tape in one continuous 
rectangle directly to the counter around the perimeter of the 
cutout as shown by the dotted line in Figure 4: “Counter 
Cutout – Foam Tape Placement”
. Leave 1/4” (6.35mm) gap 
between the foam tape and the edge of the cutout.
Install the Cooktop
Insert cooktop into the cutout. Attach clamps of the hold-
down brackets packaged with the cooktop to the rough-in 
box. Use the washer and screws provided. 
Adjust hold-down brackets to desired position and tighten 
screws to rough-in box. Insert adjusting screw into clamp 
and secure cooktop to countertop. 
NOTE: 
For solid surface material installations: Insert a wooden 
block between the end of the screw and the bottom of the 
countertop. Do not overtighten adjusting screw. Trim 
excess aluminum tape around cooktop flange.
Connect Gas Supply
The gas inlet to the unit is located at the right rear of rough-
in box.
Install the pressure regulator (supplied with unit) to 
manifold pipe using Teflon tape on threads of manifold 
pipe. Turn to hand tighten plus 1/4 turn, not exceeding 1 
turn for alignment. To prevent possible damage to the gas 
pressure regulator, install it after the rough-in box is in its 
permanent position. When the regulator is securely 
 Figure 3: Counter Cutout – Solid Surface Countertops
 Figure 4: Counter Cutout – Foam Tape Placement
Heat Reflective Tape 
Cutout shows location 
of Aluminum Reflective Tape 
Section "A - A"
A
A
1/4”
(6.35mm)
Cutout
Foam
Tape
 Figure 5: Attaching Hold-Down Brackets
 Figure 6: Rough-in Box Area
Rough-in Box
Foam
Tape
(Seal)
Adjusting
Screw
Adjusting
Screw
Clamp
Clamp
Wooden Block
(to be used with
solid surfacing
material, i.e.
Surell™ and
Corian®)
Opening for Gas 
Connection and 
Electrical Cord
for 30” models: 12 15/16” (313 mm)
for 36” models: 15 15/16” (389 mm)
C of Cutout
L
1”