Monogram ZV830SMSS Instrução De Instalação

Página de 60
9
INSTALL FRAMING 
FOR HOOD SUPPORT
IMPORTANT
— 
Framing must be capable 
of supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
• Install a horizontal support at least 1
x 6
between two wall studs at the mounting screw
location. The horizontal support must be flush with
the room side of the studs. 
Use cleats behind both
sides of the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
1
Centerline of 
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Installation Instructions
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting 
support
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
• Locate the template packed with the literature.
– Measure 36
from the floor to the top of the cooking
surface. Add hood installation height determined on 
page 7. Mark that location.
– Use a level to draw a straight pencil line on the wall. 
– Tape the template in position along the penciled 
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from 
the centerline on the template to the ceiling.
• Measure 5-1/2
from the back wall to the centerline 
of an 8-1/2
hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness 
to the 5-1/2
dimension.
Wall Ducting:
If ductwork will vent to the rear:
• Use a level to draw a line straight up from 
the centerline on the template.
• Measure at least 27-3/4
above the pencil line 
that indicates the bottom installation height, to the
centerline of an 8-1/2
dia. duct hole. (Hole may 
be elongated for duct elbow.)
HOUSE WIRING LOCATION:
• The junction box is located on the top left side 
of the hood.
• Wiring should enter the back wall at least 18
above
the bottom of the hood, and within 5-1/2
of the left
side of the centerline.
INSTALLATION—VENTED TO THE OUTSIDE
8-1/2” min. opening for ductwork
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
REAR WALL 
MOUNTING TEMPLATE
49-80514 
 10/07 
 JR
Printed 
in 
Mexico
15-7/16
15-7/16
10-1/16
C
L
1-1/4
1-1/4
9-7/16
9-7/16
TOP 
MOUNTING 
HOLE
DRILL 1/8
PILOT HOLE
TOP 
MOUNTING 
HOLE
DRILL 1/8
PILOT HOLE
BOTTOM 
MOUNTING 
HOLE
BOTTOM 
MOUNTING 
HOLE
NOTE: Top
mounting
screws MUST
engage wood
support.
NOTE: Top
mounting
screws MUST
engage wood
support.
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
Ceiling
House Wiring
Location
C
L
5-1/2”
18”
Min.
Wall vent
27-3/4” min.
above
installation
height
5-1/2” centerline to wall
FOR CEILING VENT DUCTING
8-1/2” dia. hole