Monogram ZV900SLSS Instrução De Instalação

Página de 21
Installation Preparation
REMOVE THE PACKAGING
CAUTION: 
LIFT THE HOOD OUT OF THE BOX
BY THE CENTER METAL PORTION. DO NOT LIFT BY THE
GLASS SIDES.
PRUDENCE : 
LEVEZ LA HOTTE À
L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL
CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.
CAUTION: 
Wear gloves to protect against
sharp edges.
PRUDENCE : 
Portez des gants pour éviter
les blessures causées par les tranchants.
• Grasp the hood by the metal insert in the center
and lift straight up and out of the box.
• Remove and properly discard the plastic wrapping.
• Remove parts box, duct covers and other
packaging.
TOOLS AND MATERIALS REQUIRED 
(NOT SUPPLIED
)
… Tape measure
… Knife
… Spirit level
… Wire cutter/stripper
… Wire nuts
… Electric drill with 5/16
″ and 3/8″ bits
… Phillips and flat blade screwdrivers
… Hammer
… Pliers
… Safety glasses
… Duct tape
… Tape to mount template
… Gloves to protect against sharp edges
… 120V 60Hz. 15 or 20 Amp, 2 wire with 
ground Properly grounded branch circuit
… Strain relief for junction cover
… 8
″ round metal duct, length to suit
installation
… Saw, jig saw or reciprocating saw
Measuring tape
Electric drill
with 5/16” and
3/8” Bits
12” long
Phillips 
head
screwdriver
Safety glasses
Gloves
Spirit level
Knife
Wire
cutter/stripper
Flat blade
screwdriver
Hammer
Pliers
Duct tape
Masking tape
Wire nuts
Strain relief
Saw, jig saw or
reciprocating
saw
6
8
″ round metal duct,
length to suit
installation