Monogram ZV925SLSS Instrução De Instalação

Página de 29
20
STEP 5  INSTALL LOWER STRUCTURE
TO UPPER STRUCTURE
• Slide lower frame into 
the upper frame. Match
the marked alignment
holes.
• Secure the upper and
lower frame with 16
screws, 4 on each side 
of the frame.
Installation Instructions
INSTALLATION—RECIRCULATING
STEP 6  INSTALL BLOWER/MOTOR
• Raise the blower/motor
piece toward the
assembled frame.
• Carefully raise the motor
to the marked reference
point while making sure
the duct piece slips over
the blower outlet flange.
• Secure the blower/motor
to the frame using 16
screws, 4 on each side.
• Use tape to seal the duct
connection.