Monogram ZV925SLSS Instrução De Instalação

Página de 29
23
Installation Instructions
INSTALLATION—RECIRCULATING
STEP 11  PREPARE THE DUCT COVERS
• Remove the plastic protective covering on all duct
pieces.
• Install 3 cage nuts on each inside section of 
the top duct cover. The cage nuts fit into the 
rectangular slots, clips facing outward.
• Install 3 cage nuts on each side of the lower 
duct covers.
Support
frame
Plan
diagram
Rectangular
slots
Nut
STEP 12  INSTALL UPPER DUCT COVER
• Place the tall duct covers onto the top of the
hood. This section has venting holes on one end.
NOTE: If you are installing this hood for 
recirculating operation, place the duct covers 
onto the hood with the venting slots at the top.
If the hood is vented to the outside, the holes
should be positioned on the bottom.
• Secure the sides with 6 screws installed through
the cage nuts.
• Raise the assembled duct covers to the top,
against the ceiling. 
• Match mounting holes, one on each side. Install
screws through the duct and into the support.
Top 
sections
Top 
sections