Monogram ZV925SLSS Instrução De Instalação

Página de 29
3
Design Information
PRODUCT DIMENSIONS
CONTENTS
Design Information
Product Dimensions ..............................................................................3
Advance Planning
Advance Planning  ..................................................................................4
Power Supply ............................................................................................4
Duct Fittings  ............................................................................................ 5
Installation Preparation 
Installation Height ..................................................................................6
Tools and Materials Required............................................................7
Remove the Packaging  ......................................................................7
Parts Provided  ..........................................................................................8
Installation Preparation
Construct Ceiling Support ..........................................................9–11
Installation Instructions—Vented to the Outside
Step 1, Mount Template ....................................................................12
Step 2, Adjust Frame Height ..........................................................12
Step 3, Cut Duct to Length for Vented Installation ............13
Step 4, Install the Support Frame ................................................13
Step 5, Install Hood Attachment Screws..................................13
Step 6, Mount the Hood onto the Support..............................14
Step 7, Connect Cables......................................................................14
Step 8, Connect Electrical ................................................................15
Step 9, Prepare the Duct Covers ..................................................16
Step 4, Install Upper Support Frame ..........................................19
Step 5, Install Lower Structure to Upper Structure ............20
Step 6, Install Blower/Motor............................................................20
Step 7, Install Hood Attachment Screws..................................21
Step 8, Mount the Hood onto the Support..............................21
Step 9, Connect Cables......................................................................21
Step 10, Connect Electrical..............................................................22
Step 11, Prepare the Duct Covers................................................23
Step 12, Install Upper Duct Cover................................................23
Step 13, Install Lower Duct Cover................................................24
Step 14, Install Duct Cover Trim....................................................24
Step 15, Install Filters ..........................................................................25
Step 16, Finalize Installation............................................................25
These vent hoods are supplied with a support frame
for ceiling heights of 7
′ 11″ to 10′ 1″.
Decorative duct covers conceal the ductwork running
from the top of the hood to the ceiling. 
ZX92510 accessory is available for ceiling heights of
9
′ 1″ to 10′ 1″.
27 9/16"
3 1/4"
35 7/8"
*Height
to
Ceiling
* The supplied duct cover fits 7
′ 11″ to 9′ ceiling
heights. For 9
′ 1″ to 10′ 1″ ceilings, order ZX92510.
NOTE: Installation height should be measured from the
cooking surface to the bottom of the outer glass portion
of the hood.
This hood must be installed 24
″ min. and 30″ max.
above the cooking surface. The cooking surface
should be at least 36
″ above the floor.
This hood may be vented to the outdoors, or it can 
be installed for recirculating operation.
This hood can be installed over any Monogram 
electric or gas cooktop. It cannot be installed over 
a Monogram Professional cooktop or range. 
2 3/4
*Height
to 
ceiling
27 9/16
35 7/8
24
″ min.*
30
″ max.*
36
″ min.
* Exact installation
height depends
on ceiling height.