Monogram ZV925SLSS Instrução De Instalação

Página de 29
7
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Pliers
120V 60Hz. 15 or 20 Amp, 
2-wire with ground. properly
grounded branch circuit.
Key hole saw
Wire cutter/stripper
Step ladder
Metal snips
Saber saw
or sawsall
Wire nuts
Phillips and flat blade
screwdrivers
Strain relief for
junction cover.
Spirit level
Flashlight
Safety glasses
8
″ round metal 
duct, length to 
suit installation.
Duct tape
3/8
″ swivel 
socket or pivoting
hex socket with 6
extensions
Carpenter’s square
REMOVE THE PACKAGING
CAUTION: 
LIFT THE HOOD OUT OF THE BOX
BY THE CENTER METAL PORTION. DO NOT LIFT BY THE
GLASS SIDES.
PRUDENCE : 
LEVEZ LA HOTTE À
L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL
CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.
CAUTION: 
Wear gloves to protect against
sharp edges.
PRUDENCE : 
Portez des gants pour éviter
les blessures causées par les tranchants.
• Grasp the hood by the metal insert in the center
and lift straight up and out of the box.
• Remove and properly discard the plastic wrapping.
• Remove parts box, duct covers and other 
packaging.
Hammer
Electric or battery-operated drill
and 3/16
″ bits, Phillips and flat
blade screwdriver bits.