Fujitsu FS PRIMEPOWER 2500 SO9 BASE CABINET 128CPU D:GPK25-GA75 Manual Do Utilizador
Códigos do produto
D:GPK25-GA75
Data Sheet
⏐ Issue: March 2005⏐ PRIMEPOWER 2500
Page 4 / 4
Environmental Data PRIMEPOWER 2500
System cabinet
Up to 64-way
Exp. of base
cabinet (1x)
Up to 128-way
I/O cabinet (4x)
for each 8
PCI/disk boxes
PCI/disk box
(max.32x) 4HE
DPF cabinet
(2x)
1 in each case for
system and exp.
cabinet
Width
1,066 mm
1,066 mm
644 mm
(plus 189 mm
connections for 1
or 2 I/O cabinets)
440 mm
383 mm *3)
683 mm *4)
Depth
1,144 mm
1,788 mm *1)
1,036 mm
670 mm
726 mm *3)
426 mm *4)
Height
1,800 mm
174 mm
1,800 mm
Maintenance area
Front
Rear
Left
Rear
Left
Right
800 mm
800 mm
100 mm
100 mm
800 mm
100 mm
100 mm
800 mm
1,200 mm
100 mm
800 mm
900 mm
900 mm
--
--
--
--
--
--
--
--
--
--
800 mm
800 mm
800 mm
800 mm
800 mm
--
Weight
900 kg
650 kg
230 kg'
w/o PCI/Disk box
40kg
300 kg *3)
600 kg *4)
600 kg *4)
Rated voltage
200-240 VAC ±10%
Power supply
4x standard
2x expansion
IEC309/32A *2)
6x standard
IEC309/32A *2)
4x
IEC309/16A *2)
2x
IEC320-C14 (10A)
See sys. & exp.
cabinet
Frequency
50/60 Hz -4 to +2 %
Power draw, max.
22.5 KVA
Sys. cab. 8SB
42.5 KVA
incl. sys. cabinet
16SB
-- 0.640
KVA
See sys. & exp.
cabinet
Power consumption,
max.
max.
21 KVA
Sys. cab. (8SB)
40 KVA
incl. sys. cabinet
(16SB)
-- 0.620
KVA
See sys. & exp.
cabinet
Heat generation, max.
75,600 kJ/h
Sys. cab. (8SB)
144,000 kJ/h
incl. sys. cabinet
(16SB)
-- 2,234
kJ/h
See sys. & exp.
cabinet
Under-floor air
conditioning
conditioning
---
necessary ---
---
---
Operating Temperature /
Operating height
Operating height
from 5 to 32º C / 0 - 1500 m
from 5 to 30º C / 1500 - 2000m
from 5 to 29º C / 2000 - 2500m
from 5 to 27º C / 2500 - 3000m
from 5 to 29º C / 2000 - 2500m
from 5 to 27º C / 2500 - 3000m
Relative humidity
20% - 80%, non-condensing
Safety
IEC60950 ; C22.2 No.60950 ; ICES003 (CSA108.8) ; UL60950
EMC
EN55022 / CISPR22 Class A ; EN61000-3-2 / EN61000-3-3
Electrical
standards:
standards:
Immunity
EN55024 / CISPR24
operation
EN60721-3-3 , 3K2 or 3M2 or 3C2 or 3S2
warehousing
EN60721-3-1 , 1K2 or 1M3 or 1C2 or 1S2
Mechanical
standards:
standards:
transport
EN60721-3-2 , 2K2 or 2M2 or 2C2 or 2S1
Ecology
ECO ; FSC 03230
*1) Including system cabinet
*2) Installation with 32A or 16A safety cut-off type: D
*3) In conjunction with stand alone system cabinet setup, without expansion cabinet.
*4) Only in conjunction with system cabinet setup together with expansion cabinet
DPF = Dual Power Feed Option
*2) Installation with 32A or 16A safety cut-off type: D
*3) In conjunction with stand alone system cabinet setup, without expansion cabinet.
*4) Only in conjunction with system cabinet setup together with expansion cabinet
DPF = Dual Power Feed Option
All rights, including rights created by patent grant or registration of a utility model or design as well
as rights of technical modifications are reserved. Delivery subject to availability. Designations may
be trademarks, the use of which by third parties for their own purposes may violate the rights of the
trademark owners.
Copyright
as rights of technical modifications are reserved. Delivery subject to availability. Designations may
be trademarks, the use of which by third parties for their own purposes may violate the rights of the
trademark owners.
Copyright
© Fujitsu Siemens Computers, 03/2005
Published by
Fujitsu Siemens Computers
http://www.fujitsu-siemens.com/
Company stamp