Premium PIA18064A Manual Do Serviço

Página de 44
Service manual 
24 
 
 
7.5 
Pumping down (Re-installation) 
 
 
Procedure 
Confirm that both the 2-way and 3-way valves are set to the opened position. 
Remove the valve stem caps and confirm that the valve stems are in the opened position. 
Be sure to use a hexagonal wrench to operate the valve stems. 
Operate the unit for 10 to 15 minutes. 
Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way valve. 
Connect the charge hose with the push pin to the gas service port. 
Air purging of the charge hose. 
Open the low-pressure valve on the charge set slightly to purge air from the charge hose. 
Set the 2-way valve to the close position. 
Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa. 
Immediately set the 3-way valve to the closed position. 
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa. 
Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service port caps. 
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m. 
Be sure to check for gas leakage.