Marvel Sentry Digital Drawer Refrigerator - White/Custom Overlay Door Guia De Iniciação
FULL OVERLAY PANEL INSTALLATION INSTRUCTIONS
11
Step 2: Size the Overlay Panel
Step 5: Reinstall the Drawers
Fully extend drawer slides and place drawer on
1.
slides. Be sure that drawer sits evenly on both slides.
Lock drawers into drawer slides. Push drawer locks
Lock drawers into drawer slides. Push drawer locks
2.
down and then back to relock the drawer into the
slide.
slide.
Step 4: Attach the Overlay Panel to the Drawer
Set the overlay panel on drawer front face and align
1.
edges. (See Figure 12 below). Clamp panel in posi-
tion and mark pilot hole locations. Pick the required
pilot hole size from “Table A” below and drill the pilot
holes ensuring not to drill all the way through the
overlay panel.
tion and mark pilot hole locations. Pick the required
pilot hole size from “Table A” below and drill the pilot
holes ensuring not to drill all the way through the
overlay panel.
Table A: Pilot Hole Drill Sizes for Wood Screws
Material Type
#8 Wood Screw
Hardwood
3/32 Dia. Pilot Hole
Softwood
5/64 Dia. Pilot Hole
Insert wood screws through clearance holes and
2.
tighten to secure ovelay panel.
Reinstall gasket into channel. Make sure the corners
Reinstall gasket into channel. Make sure the corners
3.
are fully inserted.
Cut the overlay panel to the dimensions shown below. Use
Figure 10 for the 60RDE Drawer, and Figure 11 for the
80RDE drawer.
Figure 10 for the 60RDE Drawer, and Figure 11 for the
80RDE drawer.
Panel thickness
23.63”
(600.2 mm)
15.19”
(385.83 mm)
Figure 10
Face of 60RDE
Overlay Panel
Panel thickness
15.19”
(385.83 mm)
Figure 11
Face of 80RDE
Overlay Panel
29.63”
(752.6 mm)
Figure 12
Overlay panel
flush with
edges of drawer
front
flush with
edges of drawer
front
Using clearance holes in
gasket channel mark
hole locations onto panel
gasket channel mark
hole locations onto panel
Screw clearance
hole through
gasket extrusion
hole through
gasket extrusion