Sterling SGFE Manual Do Utilizador

Página de 50
4.2. Main ten an ce  sche du le
In iti al  ope ra ti on:
Check  the  ro ta tio nal  di rec ti on  of  the  va cu um 
ge ne ra tors
Check the line sys tem
Ad just  the  suc ti on  tube
Dai ly:
Check war ning signs on equip ment for le gi bi li ty 
and  com ple te ness
Check the oil le vel in the oi ler
Emp ty  the  wa ter  se pa ra tor
Check ope ra ting pres su re of the plant’s supp ly
net work (5-6 bar (72.52-87.02 PSI) sys tem over
pres sure)
Check the oil le vel in ro ta ry val ve pumps
Fol low  the  ma nu fac tu rer’s  ope ra ting  in struc tions
Wee kly/month ly:
Cle an  the  fil ter  car trid ge
(ac cor ding  to  the  ac cu mu la ti on  of  dust)
Check that the main switch on the equip ment
is functio ning
Every six months:
Re pla ce  the  fil ter  car trid ge 
(ac cor ding  to  the  ac cu mu la ti on  of  dust)
Check the set tings on the le vel pro bes (if pre sent)
Check that all elec tri cal and me cha ni cal 
con nec tions  fit  se cu re ly
Chan ge oil and oil fil ters on the ro ta ry val ve pumps
Fol low  the  ma nu fac tu rer’s  ope ra ting  in struc tions
Lu bri ca te the bea rings with high mel ting-point 
grea se on the ro ta ry lobe va cu um pumps
Fol low  the  ma nu fac tu rer’s  ope ra ting  in struc tions
8
1
6-
4
M
S
Main ten an ce  sche du le
Main ten an ce  4-3