Lucent Technologies Release 8.2 Manual Do Utilizador

Página de 524
Configuration 4:  R8csi <—ISDN—> R8si Gateway 
<—ppp—> R8csi 
3  
C-LAN Administration
Administration for Network Connectivity
CID: 77730
555-233-504 — Issue 1 — April 2000
124
Configuration 4:  
R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
 
In this configuration, a DEFINITY ECS R8r provides gateway conversion between 
ISDN and TCP/IP.
Task Summary
The following tasks need to be completed for Switch 1, Switch 2, and Switch 3:
1  
Review checklist
2  
Switch 1 administration
 a  
Assign node names
 b  
Assign signaling group and administered NCA TSC
 c  
Assign ISDN-TSC Gateway Channel
 d  
Assign link (via a data module) to node 3
 e  
Assign processor channels
3  
Switch 2 administration
 a  
Assign signaling group and administered NCA TSC
4  
Switch 3 administration
 a  
Enable bus bridge connectivity
 b  
Assign node names
 c  
Assign link (via a data module) to node 1
 d  
Assign processor channels
5  
Enable links and processor channels
DEFINITY
ECS R8si
ISDN
Switch 1
DEFINITY ECS
Switch 3
DEFINITY ECS
Switch 2
R8csi
ppp    
R8csi
DS1
DS1
node-3
node-1
DS1
C-LAN
DS1
C-LAN