Lucent Technologies Release 8.2 Manual Do Utilizador

Página de 524
Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) 
<—ethernet—> R8si 
149
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000
CID: 77730
3  
C-LAN Administration
Switch 1 Task — Assign Link via ppp Data Module to Switch 2
This task administers a ppp data module on Switch 1 for the ppp connection to Switch 
2. The data module associates a link number with a port address, extension number, 
and node name for the C-LAN port used for this connection.
Begin
Steps
Open Data Module form — enter 
ad da 2376
> Enter values
add data-module 2376 
                                                                 Page 1 of x
                          DATA MODULE
    Data Extension: 2376 
Name: _ppp on link 1 to node-2___  BCC: 2
              Type: ppp
    
COS: 1
              Port: 01c0815 COR: 
1
              Link: 1_           
TN: 1
       Enable Link? n
         Node Name: node-1-ppp
_
Subnet Mask: 255.255.255.0 
Establish Connection: y
DESTINATION
            Digits: 8993020_________
      Node Name: node-2__________
              CHAP? n
Field
Conditions/Comments
Type:
This indicates the data-module type for this connection.
Port:
In this example, the C-LAN circuit pack is in slot 01c08; the 
ppp connection is through port 15.
Link:
The link number must be in the range 1 – 33 (for R8r), not 
previously assigned on this switch.
Enable Link?
If you need to add an IP route that uses this node as a gateway, 
this field must be set to 
y
 before adding the IP route. Otherwise 
leave this field set to 
n
 until the link administration is complete; 
that is, until after all data modules and the processor channels 
are assigned, then set to 
y
.
Name:
Information-only; appears in list generated by the “list data 
module” command.
BCC:
Bearer Capability Class. This is a display-only field.
1 of 2