Tektronix 2200 Manual Do Utilizador

Página de 188
2-2
Section 2 — Installation
Unpacking
The Model 2200 is packaged in several boxes, which contain the following: 
Switcher Frame 
Control Panel
Cables and Power Cords
Power Supplies 
Instruction Manuals 
Options 
Carefully check the contents of each box against the packing slip to ensure 
that everything shipped to you was received. If any items are missing or 
damaged, contact the shipping company or your supplier or sales 
representative immediately.
Pre-installation Procedures
Before you install the Model 2200, there are certain considerations such as 
tools required, physical specifications, safety and power requirements you 
should be aware of. These considerations are covered in the following 
sections.
Items Required but not Supplied
The following is a list of items required for installation:
Medium flat bladed screwdriver
Medium Phillips head screwdriver
#10, #15, & #20 Torx screwdrivers
3/8” deep well socket 
Torque Wrench (100 inch pound range)
1/8” (3mm) drill
six #6 (M4) screws