GE LP 33 Manual Do Utilizador

Página de 57
Modifications reserved 
Page 46/57 
OPM_LPS_3UO_30K_40K_0US_V010.doc 
Operating Manual LP 33 Series 30 & 40 kVA 
6.  In order to discharge the DC link capacitors, start once more 
the inverter on each unit through the screen
MENU/COMMAND MENU/INVERTER ON
 
 
COMMAND MENU 
INVERTER ON * 
INVERTER OFF 
 
 
Remark: command 
INVERTER ON will be enabled only when 
the inverter voltage of each phase decreases 
below 7 VAC (about 30 seconds). 
 
INVERTER: U1= 
 
7V 
U2=  7V U3=  7V 
Frequency    =    60.0Hz 
Synchronized
 
 
Before proceeding to step 7, check on the display panel that 
the DC link voltage (both polarities) Udcp and Udcn has reached 
the minimum voltage of 5 VDC (about 30 seconds). 
 
Udcp=  5V Udcn= 
5V 
Ubp=0V 
Ubn=0V   O 
Charge level 
=  0% 
Autonomy = 
0min
 
 
7.  Switch OFF the inverter on each unit entering the screen
MENU/COMMAND MENU/INVERTER OFF 
 
COMMAND MENU 
INVERTER ON 
INVERTER OFF * 
 
 
The load is now supplied directly from the mains through the manual switches Q2
 
END OF PROCEDURE 
 
 
 
 
 
 
 
 
WARNING ! 
The UPS cabinet contains parts electrically live. 
Apart from the front door, do not open any other part of the UPS
 
 
 
 
NOTE ! 
With separate mains inputs, it’s possible to disconnect mains rectifier.