Toshiba ProT1!0 Manual Do Utilizador

Página de 279
Chapter 4 Replacement Procedures 
 
Satellite T110 / Satellite Pro T110 /  PORTEGE T110Maintenance Manual (960-Q08) 
 
 
34
Installing the top cover assembly 
The following describes the procedure for installing the cover assembly. 
1.  Connect the Power FFC to the connector on the power board.   
2.  Secure the power board with the following screws.  
  M2.03F        FLAT BIND screw              x2 
3.  Install the top cover assembly to the base assembly. 
NOTE:  Be careful not to catch the cables between cover assembly and base assembly.  
4.  Connect the touch pad FFC /LAN FFC/ Power FFC to the connector on the system 
board. 
5.  Install the Keyboard and Keyboard holder. 
6.  Secure the cover assembly with the following screws from the back and bottom of 
computer. 
  M2.02F           FLAT BIND screw             x3 
  M2.03F           FLAT BIND screw             x2 
  M2.04F 
FLAT BIND screw             x9 
  M2.06F 
FLAT BIND screw    
x3 
  M2.58F 
FLAT BIND screw              x2