Toshiba ProT1!0 Manual Do Utilizador

Página de 279
Chapter 1 Hardware Overview  
 
Satellite T110 / Satellite Pro T110 /PROTEGE110 Maintenance Manual (960-Q08)                                                         
13
1.6  Power Rails 
Table 1-6-1 lists the power rail output specifications of CULV platform. 
Power supply  (Yes/No 
Name
 
Voltage [V] 
Power OFF 
Suspend mode 
Power OFF 
Boot mode 
No Battery 
+5VPCU
 
Yes 
Yes 
No 
+5V
 
5 No 
No 
No 
+3VPCU
 
3.3 
Yes 
Yes 
No 
+3V_S5
 
3.3 
Yes 
No No 
+3VSUS
 
3.3 
Yes 
No No 
+3V
 
3.3 No 
No 
No 
+1.8VSUS
 
1.8 
Yes 
No No 
+SMDDR_VTERM
 
1.8 
Yes 
No No 
+SMDDR_VREF
 
1.8 
Yes 
No No 
+1.8V
 
1.8 No 
No 
No 
+1.5V
 
1.5 No 
No 
No 
+1.2V
 
1.25 No 
No 
No 
+1.05v 
1.05 No 
No 
No 
+NB_CORE
 
1.0~1.2 No 
No 
No 
VCC_CORE
 
0.7~1.2 No 
No 
No 
Table 1-6-1 CULV Power supply output rating