Peerless Industries 151-071M Manual Do Utilizador

Página de 12
151-071M
3/31/2004
Great Plains Mfg., Inc.
Seed Box Agitator Option 
2
5.
Slide lock collars (8 and 10) against bearing 
and flanges (7 and 11) and tighten set 
screws.
Figure 2
Agitator shaft Installation
18727
2.
Slide agitator shaft (5) into seed box from left 
side of drill.
3.
As shaft advances, slide on parts in the fol-
lowing order.
• 35 tooth sprocket (6) 
• bearing and flanges (7)
• lock collar (8)
• bearing and flanges (9)
• lock collar (10)
• bearing and flanges (11)
4.
Attach bearings and flanges to divider (12) 
and inside of end panels (13 and 14) with 5/16 
x 1 inch round head bolts, lock washers and 
hex nuts.