Empire Comfort Systems VFDR18LB10N-1 Manual Do Utilizador

Página de 32
Page 15
23099-1-0707
Flames from the pilot (rear right back side of the pan burner) as 
well as the main flame should be visually checked as the log set 
is installed.
In normal operation at full rate, the flame appearance should be sets 
of yellow flames above the rear burner section, and shorter blue 
flames with glowing embers on the front burner section.
NOTE: all flames will be random by design, flame height will go 
up and down.
Avoid any drafts that alter burner flame patterns. Do not allow fans 
to blow directly into fireplace. Do not place a blower inside the 
burner area of the firebox. Ceiling fans may create drafts that alter 
flame patterns. Sooting and improper burning will result.
During  manufacturing,  fabricating  and  shipping,  various 
components of this appliance are treated with certain oils, films or 
bonding agents. These chemicals are not harmful, but may produce 
annoying smoke and smells as they are burned off during the initial 
operation of the appliance, possibly causing headaches or eye or 
lung irritation. This is a normal and temporary occurrence.
The initial break-in operation should last 2-3 hours with the burner 
at the highest setting. Provide maximum ventilation by opening 
windows or doors to allow odors to dissipate. Any odors remaining 
after this initial break-in will be slight and will disappear with 
continued use.
Millivolt Valve for VFDR Series
Figure 17
VALVE PRESSURE TEST
PORT ACCESS HOLES
ON/OFF/PILOT
CONTROL KNOB
HI/LO CONTROL
KNOB
ON/OFF/REMOTE
SWITCH
PIEZO
IGNITOR
BURNER TUBE
PILOT ASSEMBLY
OPERATION INSTRUCTIONS/FLAME APPEARANCE
MANUAL VALVE
CONTROL KNOB
PIEZO
IGNITOR
BURNER TUBE
PILOT ASSEMBLY
MANUAL VALVE
CONTROL KNOB
PIEZO
IGNITOR
BURNER TUBE
PILOT ASSEMBLY
Thermostat Valve for VFDT Series
Figure 18
Manual Valve for VFDM Series
Figure 19
Millivolt Valve for VFDR18LB10 Series
Figure 16
VALVE PRESSURE TEST
PORT ACCESS HOLES
ON/OFF/PILOT
CONTROL KNOB
ON/OFF/REMOTE
SWITCH
PIEZO
IGNITOR
BURNER TUBE
PILOT ASSEMBLY