2–Pump 12-Station Controllers 
Chapter 3:  Installation 
14 
Chapter 3:  Installation 
3-1 Uncrating 
2-Pump, 12-Station Controllers are shipped mounted on a skid, enclosed in a plastic wrapper, 
and contained in a cardboard box. 
1.  Pry the crating away from the skid. 
Note:  Remove the nails holding the box to the skid and lift the box off 
carefully; avoiding staples in the 1’ x 4’ wood supports.  Cut the steel 
banding. 
2.  Use a pry bar to remove the blocks securing the unit to the skid. 
3.  Lift unit from sides. Lift slowly and only high enough to clear the skid.  Use a pry bar 
if necessary to carefully remove the skid from the unit. 
4.  Lower slowly.   
3-2  Mounting the Control Panel 
Note:  Before you mount the panel, consider how you run wiring to the 
vacuum hoppers, the filter chamber atmospheric valve (if so equipped) 
and the pump motor starter(s), vacuum switch(es), and vent valve(s).  
Mount the panel on a flat, vertical area. It should be a visible area that gives your operator 
access to the control. The panel requires a low voltage power drop as listed on the serial tag. 
3-3 Electrical 
Connections 
Refer to local electrical codes, the schematic and connection diagrams supplied with this unit 
and the serial tag for wiring considerations. Run all wiring in conduit if codes require it. 
Making Control Panel Power Drop Wiring Connections 
Plug the power cord supplied with your unit into a properly grounded, 3-slot, 115/1/50-60 VAC 
or 230/1/50-60 VAC receptacle specified on the control panel serial tag. The control enclosure 
draws less than five (5) amps during normal operation at 115/1/50-60 VAC. 
Caution! 
We recommend that you protect PLC memory by providing the control 
panel with a dedicated circuit, a true earth ground, and a spike/surge 
protector.