Avaya S8100 Manual Do Utilizador
Checklists and job aids
Initial installation
Initial installation
6
S8100 Installation and Upgrades
November 2003
5
For S8100, determine which equipment is required
and which is optional.
and which is optional.
For a G600, see
For a CMC1, see
6
Install the system’s cabinet, making sure there is
adequate ventilation.
adequate ventilation.
— Verify the carrier address ID on G600 or
CMC1 cabinets.
ID: _________________
ID: _________________
— Mount the cabinets.
For G600, print a 7 × 11
″
copy of the G600
mounting template provided on the CD.
For a G600, see
or
For a CMC1, see
7
Check electrical components.
— Check AC power.
— Ground power supply.
— Connect uninterruptible power supply (UPS).
— Disconnect AC power by pulling the AC
power cord from the appliance inlet.
— Connect cabinet and other grounds.
— Install coupled bonding connector.
— Connect the power cords.
For a G600, see
or
For a CMC1, see
8
Connect the cables.
— Install the Processor Interface cable.
— Install the system cables for multiple
cabinets, if necessary.
For a G600, see
or
For a CMC1, see
9
Install the S8100 patch panels (G600) or the main
distribution frame (CMC1).
distribution frame (CMC1).
For a G600, see
or
For a CMC1, see
10
Install equipment-room hardware for G600 or
CMC1.
CMC1.
— Cross-connect the cabinet to the patch panels
for G600 or to the MDF for CMC1.
— Identify the allowed circuit packs.
— Install the circuit packs.
— Be sure that off-premises circuits have
protection from hazardous voltages and
currents.
currents.
— Install sneak fuse panels.
— For CMC1, label the MDF.
See:
DEFINITY Communications System Generic 1 and
Generic 3 Main Distribution Field Design (555-
230-630)
Generic 3 Main Distribution Field Design (555-
230-630)
and
or
Installation tasks
For more information