Manual Do Utilizadoríndice analíticoSECTION 1 - INTRODUCTION41.1 General Description41.2 Standard Configurations51.3 Typical Installations51.4 How the OVATION™ Series Automatic Transfer Switch Works61.5 Key Components71.6 Standards Compliance10SECTION 2 – COMPATIBLE EQUIPMENT112.1 Compatible Generators112.2 Compatible Circuit Breakers11SECTION 3 – PREPARING FOR INSTALLATION123.1 Tools Required123.2 Unpacking/Inspection123.3 Mounting Location123.4 Planning, Selecting and Prioritizing Your Circuits12SECTION 4 – INSTALLATION AND WIRING154.1 Standard Mounting Procedures184.2 Mounting Procedure for Two Load Centers204.3 Connecting the Low Voltage Cable to the OVATION™ Series ATS204.4 Connecting the Low Voltage Cable to the Generator214.5 Installing and Wiring PowerPause™ Load Management Modules21SECTION 5 – PROGRAMMING THE SYSTEM235.1 Setting Generator Size235.2 Setting Generator Exercise Schedule and Transfer Option235.3 User Interface Display LEDs235.4 User Interface Display/Control Module Functions24SECTION 6 –STARTUP AND TESTING256.1 Preliminary Checks256.2 Energizing the Transfer Switch256.3 Testing the Transfer Switch256.4 Programming the PowerPause™ Load Management Modules (if installed)256.5 Re-Installing Covers and Labeling Circuits266.6 Generator Battery Monitoring26SECTION 7 – TROUBLESHOOTING277.1 Basic Troubleshooting277.2 Troubleshooting Guide27SECTION 8 – MAINTENANCE AND SERVICE298.1 Maintenance298.2 Factory Default Settings298.3 Product Registration29Tamanho: 2 MBPáginas: 36Language: EnglishAbrir o manual