Manual Do Utilizadoríndice analíticoAbout This Document3Contents71 Changes in the RRU3642 Installation Guide92 Installation Preparations102.1 Reference Documents112.2 Tools and Instruments112.3 Skills and Requirements for Onsite Personnel123 Information About the Installation133.1 RRU Exterior143.2 RRU Ports143.3 RRU Indicators173.4 Installation Options183.5 Installation Clearance Requirements of an RRU233.5.1 Installation Clearance for a Single RRU233.5.2 Installation Clearance for Multiple RRUs253.5.3 Installation Spacing Between RRUs284 Unpacking the Equipment325 Installation Process346 Installing the RRU356.1 Mounting Kits for an RRU376.2 Installing the RRU on a Pole376.2.1 Installing a Single RRU406.2.2 Installing Two RRUs426.2.3 Installing Multiple RRUs456.3 Installing the RRU on U-steel486.4 Installing the RRU on Angle Steel526.5 Installing the RRU on a Wall556.6 Hoisting an RRU onto a Tower597 Installing RRU Cables637.1 Cabling Requirements657.2 Cable Connections707.3 Installation Process737.4 RRU Cable List737.5 Installing the RRU PGND Cable767.6 Installing an RRU RF Jumper777.7 Installing an Inter-RRU RF Cable807.8 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable817.9 Opening the Cover Plate of an RRU Cabling Cavity837.10 Installing an RRU power cable857.11 Installing a CPRI Fiber Optic Cable877.12 Installing an RRU Alarm Cable897.13 Closing the Cover Plate of an RRU Cabling Cavity908 Checking the RRU Hardware Installation929 Powering On an RRU9310 Appendix9410.1 Adding an Easy Power Receptacle (Pressfit Type) Connector to the RRU Power Cable on the RRU Side95Tamanho: 3 MBPáginas: 98Language: EnglishAbrir o manual