Manual Do Utilizadoríndice analíticoPreface1Audience1Purpose1Scope1Conventions1Introduction1Introduction1References1Safety Precautions1Electrostatic discharge (ESD)1Working near High Voltage Sources1Further Safety Recommendations1System Definition1MC-Series Standard Capacity system Configuration1RadioFrame Networks Hardware11.6.1 Airlink BTS Interface Chassis (ABIC)11.6.2 CRIC11.6.3 BPC11.6.4 ERTM11.6.5 CRTC11.6.6 Diversity RadioBlade Shelf (DRBS)11.6.7 Multi-Channel RadioBlade (MCRB) Transceivers11.6.8 MC-Series Standard Capacity RF Shelf11.6.9 Power Distribution Unit11.6.10 System Manager Software1MC-Series Standard Capacity system cabinet11.7.1 Air Conditioning1Non-RadioFrame Networks Hardware (must be installed)11.8.1 integrated Site Controller (iSCIII (must be installed))11.8.2 Environmental Alarm System (EAS (must be installed))11.8.4 GPS Antenna System (must be installed)11.8.5 Powerplant (must be installed)1Specifications2Physical Dimensions2Weight2Power Specifications22.3.1 Power Requirements22.3.2 Power Consumption22.3.3 Grounding22.3.4 Heat Load2Performance Specifications2Operating Frequency Bands2RF Performance Requirements22.4.1 Receiver Performance Summary22.4.2 Transmitter Performance Summary22.4.3 Tx Power Out22.4.4 Spurious RF Emissions2Environmental Equipment Specifications2Compliance2Pre-Installation3Pre-Installation Requirements3Site Planning33.2.1 Space Requirements33.2.2 Anchoring33.2.3 Seismic Zone Installation33.2.4 Cooling of Equipment33.2.5 Power33.2.6 Grounding33.2.7 GPS Antennas33.2.8 T1 Service33.2.9 Alarm Blocks33.2.10 Environmental Alarm System (EAS)3Scheduling / Logistics3iDEN Configuration33.4.1 Cabinet and Position Settings33.4.2 BRs33.4.3 Sectorization3Site Inspection3Receipt of Equipment3RadioFrame Networks3Non-RadioFrame Networks33.6.1 Equipment Inspection33.6.2 Equipment Inventory3Installation Process4Mounting the MC-Series Standard Capacity system cabinet44.1.1 iSCIII44.1.2 EAS44.1.3 CSU4Mounting Auxiliary Equipment4Cabinet-to-Site Cabling44.3.1 Matching Terminals for PDU and Ground44.3.2 GPS surge arrestor44.3.3 Tx/Rx Surge Suppressor44.3.4 RF Feed-Throughs (N-type connectors)44.3.5 Grounding44.3.6 T1/E144.3.7 GPS Surge Arrestor44.3.8 EAS Alarm Cabling44.3.9 RF (Tx / Rx and Rx diversity)44.3.10 Power4Initial Power-up5Initial Powering Procedure5System Setup5Management—Datafill, Configuration and Optimization55.3.1 Datafill55.3.2 Parameters that Do Not Apply55.3.3 Recommended Datafill Parameters55.3.4 rxTxGain = 055.3.5 defaultTxPower5System Manager, Configuration, and Optimization55.4.1 Navigating System Manager5Functionality Test5Configuring the MC-Series Standard Capacity system55.6.1 Navigating the System Configuration5Optimization Procedures55.7.1 Local Performance Monitoring55.7.2 iDEN Uplink Analysis5System Configuration Changes6Upgrading MC-Series Standard Capacity system Software66.1.2 Download FTP Server Software to the Laptop Computer6Update the MC-Series Standard Capacity system Software66.2.1 Verify the Software Download6Rollback to the previous version of software6Performing a System Reset6Final Checkout7Final Checkout procedures77.1.1 Prerequisites7Required Tools:77.1.2 Checkout Procedures7Troubleshooting the MC-Series Standard Capacity system8Maintenance88.1.1 Annual Maintenance8Troubleshooting Guidelines8Hardware Alerts88.3.1 Fault Indications88.3.2 ABIC Indicators88.3.3 DRBS Indicators88.3.4 RF Shelf Indicators8Software Alerts8System Manager Alarms88.4.1 Viewing System Manager Alarms88.4.2 OMC Alarm Code8iDEN Alarm Code 413388.4.3 System Manager Alarms8RadioBlade Transceiver Alarm Handling8RadioBlade Troubleshooting88.6.1 RadioBlade Locking Policy88.6.2 Standby Blade88.6.3 Locking Policy for RadioBlade Transceiver with Errors8Serial Log Upload Procedure8Field Replaceable Unit (FRU) Procedures9Field Replaceable Units (FRUs)99.1.1 Field Replaceable Unit (FRU) Policy99.1.2 Field Replaceable Units (FRUs), Parts and Extra Supplies9Power Down Procedure9RF Shelf99.3.1 RF Shelf Replacement Procedure99.3.2 Replacing a Fan in the RF Shelf9Replacing a Chassis: ABIC or DRBS99.4.1 ABIC99.4.2 DRBS9ABIC– FRU Replacement Procedure99.5.1 Replacing the CRIC99.5.2 BPC99.5.3 ERTM99.5.4 CRTC9Adding or Removing RadioBlade Transceivers9RadioBlade Transceiver Replacement9Power Distribution Unit (PDU)99.8.1 PDU9Introduction1References1Safety Precautions1System Definition1Electrostatic discharge (ESD)1Working near High Voltage Sources1Further Safety Recommendations11.5 MC-Series Standard Capacity system Configuration11.6 RadioFrame Networks Hardware11.6.1 Airlink BTS Interface Chassis (ABIC)11.6.2 CRIC11.6.3 BPC11.6.4 ERTM11.6.5 CRTC11.6.6 Diversity RadioBlade Shelf (DRBS)11.6.7 Multi-Channel RadioBlade (MCRB) Transceivers11.6.8 MC-Series Standard Capacity RF Shelf11.6.9 Power Distribution Unit11.6.10 System Manager Software11.7 MC-Series Standard Capacity system cabinet11.8 Non-RadioFrame Networks Hardware (must be installed)11.8.1 integrated Site Controller (iSCIII (must be installed))11.8.2 Environmental Alarm System (EAS (must be installed))11.8.4 GPS Antenna System (must be installed)11.8.5 Powerplant (must be installed)12.1 Physical Dimensions22.2 Weight22.3 Power Specifications22.3.1 Power Requirements22.3.2 Power Consumption22.3.3 Grounding22.3.4 Heat Load22.4 Performance Specifications22.4.1 Receiver Performance Summary22.4.2 Transmitter Performance Summary2Operating Frequency Bands2RF Performance Requirements22.4.3 Tx Power Out22.4.4 Spurious RF Emissions22.5 Environmental Equipment Specifications22.6 Compliance23.1 Pre-Installation Requirements33.2 Site Planning33.2.1 Space Requirements33.2.2 Anchoring33.2.3 Seismic Zone Installation33.2.4 Cooling of Equipment33.2.5 Power33.2.6 Grounding33.2.7 GPS Antennas33.2.8 T1 Service33.2.9 Alarm Blocks33.2.10 Environmental Alarm System (EAS)33.3 Scheduling / Logistics33.4 iDEN Configuration33.4.1 Cabinet and Position Settings33.4.2 BRs33.4.3 Sectorization33.5 Site Inspection33.6 Receipt of Equipment3RadioFrame Networks3Non-RadioFrame Networks33.6.1 Equipment Inspection3Equipment Inventory34.1 Mounting the MC-Series Standard Capacity system cabinet44.1.1 iSCIII44.1.2 EAS44.1.3 CSU44.2 Mounting Auxiliary Equipment44.3 Cabinet-to-Site Cabling44.3.1 Matching Terminals for PDU and Ground44.3.2 GPS surge arrestor44.3.4 RF Feed-Throughs (N-type connectors)44.3.5 Grounding44.3.6 T1/E144.3.7 GPS Surge Arrestor44.3.8 EAS Alarm Cabling44.3.9 RF (Tx / Rx and Rx diversity)44.3.10 Power45.1 Initial Powering Procedure55.2 System Setup55.3 Management—Datafill, Configuration and Optimization55.3.1 Datafill55.3.2 Parameters that Do Not Apply55.3.3 Recommended Datafill Parameters55.3.4 rxTxGain = 055.3.5 defaultTxPower55.4 System Manager, Configuration, and Optimization55.4.1 Navigating System Manager55.5 Functionality Test55.6 Configuring the MC-Series Standard Capacity system55.6.1 Navigating the System Configuration55.7 Optimization Procedures55.7.1 Local Performance Monitoring55.7.2 iDEN Uplink Analysis56.1 Upgrading MC-Series Standard Capacity system Software66.1.2 Download FTP Server Software to the Laptop Computer66.2 Update the MC-Series Standard Capacity system Software66.2.1 Verify the Software Download66.3 Rollback to the previous version of software66.4 Performing a System Reset67.1 Final Checkout procedures77.1.1 Prerequisites77.1.2 Checkout Procedures78.1 Maintenance88.1.1 Annual Maintenance88.2 Troubleshooting Guidelines88.3 Hardware Alerts88.3.1 Fault Indications88.3.2 ABIC Indicators88.3.3 DRBS Indicators88.3.4 RF Shelf Indicators88.4 Software Alerts8System Manager Alarms88.4.1 Viewing System Manager Alarms88.4.2 OMC Alarm Code8iDEN Alarm Code 413388.4.3 System Manager Alarms88.5 RadioBlade Transceiver Alarm Handling88.6 RadioBlade Troubleshooting88.6.1 RadioBlade Locking Policy88.6.2 Standby Blade88.6.3 Locking Policy for RadioBlade Transceiver with Errors88.7 Serial Log Upload Procedure89.1 Field Replaceable Units (FRUs)99.1.1 Field Replaceable Unit (FRU) Policy99.1.2 Field Replaceable Units (FRUs), Parts and Extra Supplies99.2 Power Down Procedure99.3 RF Shelf99.3.1 RF Shelf Replacement Procedure99.3.2 Replacing a Fan in the RF Shelf99.4 Replacing a Chassis: ABIC or DRBS99.4.1 ABIC99.4.2 DRBS99.5 ABIC– FRU Replacement Procedure99.5.1 Replacing the CRIC99.5.2 BPC99.5.3 ERTM99.5.4 CRTC99.6 Adding or Removing RadioBlade Transceivers99.7 RadioBlade Transceiver Replacement99.8 Power Distribution Unit (PDU)99.8.1 PDU9Tamanho: 3 MBPáginas: 197Language: EnglishAbrir o manual