Manual Do Utilizadoríndice analíticoSECTION 1: Heater Safety2SECTION 13: Servicing271.1 Manpower Requirements213.1 Servicing Instructions271.2 Safety Labels and Their Placement213.2 Burner Maintenance27SECTION 2: Installer Responsibility413.3 Fan/Motor Assembly Maintenance272.1 Clearances to Combustibles413.4 Heat Exchanger Maintenance272.2 Corrosive Chemicals413.5 Gas Control Valve Maintenance282.3 National Standards and Applicable Codes413.6 Flue Fan28SECTION 3: Clearances to Combustibles513.7 Maintenance Checklist283.1 Required Clearances to Combustibles5SECTION 14: Conversion Between Gases30SECTION 4: Critcal Considerations714.1 General304.1 Ventilation714.2 Burner Conversion304.2 Gas Supply714.3 Gas Valves304.3 Electrical Supply7SECTION 15: Troubleshooting314.4 Flue715.1 General32SECTION 5: Specifications85.1 CTCUA (All Models)8Systems335.2 General Technical Data Table (All Models)915.3 Troubleshooting for Flame Supervision System345.3 Technical Data Table (All Models)915.4 Troubleshooting for Solenoid Valves34SECTION 6: Heater Installation1015.5 Troubleshooting for Main Fan356.1 General10SECTION 16: Removal and Replacement Parts366.2 Basic Information1016.1 Gas Valve366.3 Location and Suspension1016.2 Burner Compartment376.4 Handling1016.3 Ignition Electrode and Flame Probe386.5 Suspension and Shelf Mounting1016.4 Flue Fan Vertical Installation (Models 7 - 15)396.6 Wall Mounting1016.5 Flue Fan Vertical Installation (Models 22 - 32)40SECTION 7: Flue Installation1316.6 Pressure Switch417.1 Flue Installation1316.7 Ignition Control427.2 Changing Flue and Air Intake Orientation1316.8 CTCUA Axial Fan/Guard/Motor Assembly427.3 Type C12, C32 & C62 Appliance1316.9 Fan and Limit Thermostats427.4 Type B22 Appliance13SECTION 8: Air Supply168.1 Room Sealed Installation168.2 Open Flued Installation168.3 Building Ventilation16SECTION 9: Gas Pipe Work179.1 Connections17SECTION 10: Wiring and Electrical Information1910.1 Electrical Supply1910.2 Remote Controls1910.3 CTCUA Wiring Diagram (Models 7-32)20SECTION 11: Commissioning2111.1 Pre-Commission Checks2111.2 Gas Supply2111.3 Mechanical Checks2111.4 Begin Commissioning2211.5 Combustion Testing2311.6 Turning Off the Heater2311.7 External Controls2311.8 Complete the Commissioning2411.9 Instruction to the User24SECTION 12: User Instructions2512.1 User Instructions2512.2 Heater Operation2512.3 Common User Controls2512.4 Lighting Instructions2612.5 Simple Fault Finding26Figure 1: Front and Back Panel Label Placement2Figure 2: Side Panel Label Placement3Combustibles6Figure 4: Suspension Methods11Figure 5: Shelf Mounting and Hanging Suspension12Figure 6: Vertical Louvres (Optional)12Figure 7: Flue and Roof Detail14Type B22 Appliance14Type C12 C32 & C62 Appliances15Connector18Figure 11: Automatic Burner Control Box Sequence22Figure 12: Gas Valve for Heater (Models 7 - 32)23Figure 13: Heater Operating Sequence25Tamanho: 5 MBPáginas: 50Language: EnglishAbrir o manual