Справочник Пользователя для Mitsubishi Electronics -NZ2GF2B-60DA4
41
CHAPTER 4 THE PROCEDURE BEFORE OPERATION
4
CHAPTER 4
THE PROCEDURE BEFORE
OPERATION
OPERATION
This section describes the procedure before operation.
*1
To replace the module, refer to this section.
To replace the module, follow the procedure described below.
• Power off the module and remove the D/A converter module.
• Prepare a new D/A converter module and perform the procedure above from "Setting a station number" to
• Prepare a new D/A converter module and perform the procedure above from "Setting a station number" to
"Parameter settings and programming". (The network parameter of the master station does not need to be set
again.)
again.)
• When using the user range setting, perform the offset/gain setting.
• After checking the operation, restart the control.
• After checking the operation, restart the control.
*1
Check box
Set the station number for an D/A converter module.
Setting a station number
Connection
When using an extension module, connect the extension module to the
D/A converter module.
After that, mount the D/A converter module to a DIN rail.
D/A converter module.
After that, mount the D/A converter module to a DIN rail.
Connect the D/A converter module to a power supply, Ethernet cables,
and external devices.
and external devices.
Parameter settings and programming
Set parameters and create a program.
Offset/gain setting
To use user range settings, configure the offset/gain setting.
Wiring