Справочник Пользователя для Mitsubishi Electronics QJ7LP25G

Скачать
Страница из 400
 
 
 
4 - 13                                                                                                                                                       4 - 13 
MELSEC-Q
4   SETTING AND PROCEDURE BEFORE OPERATION 
 
4.4 Stopping the CPU (Unintentional Output Prevention) 
STOP
RUN
 
Set the CPU module's RUN/STOP switch to the STOP side. 
 
4.5 Checking the Input Power Supply Voltage 
Check that the supply power voltage to the power supply module is within the 
specifications. 
 
4.6 Powering On 
Check the power supply to the network module. 
 
4.6.1 Checking the on status of the POWER LED of the power supply module 
POWER
 
The POWER LED lights up at the same time when the programmable controller 
system is powered on. 
 
4.6.2 Checking the on status of the RUN LED of the network module 
RUN
REM.
T.PASS
D.LINK
SD
RD
ERR.
L ERR.
Remote I/O station
RUN
MNG
T.PASS
D.LINK
SD
RD
ERR.
L ERR.
Remote master station
 
The RUN LED lights up in green when the network module of remote master station 
and remote I/O station is operating normally. 
If this LED does not light up, refer to Chapter 8, "Troubleshooting."