Справочник Пользователя для Harrington Hoists EDCK2

Скачать
Страница из 4
 
ED1050 KITS  
EDCK1 & EDCK2
INSTALLATION INSTRUCTIONS 
1050LB CAPACITY 
 
 
 
 
2 of 4
 
GENERAL USE
EDOC0321, REV 00
9/28/05
 
2.4  Install the cushion rubber (from ED525) and stopper complete set (from ED525) on the no-load side of 
the load chain. 
2.5  Install the appropriately sized chain container (Figure 43), for the load chain length using Socket Bolt BP 
(Figure 44), U nut (Figure 45) and Split Pin (Figure 46).  Refer to Owner’s Manual. 
2.6  Attach Nameplate B (Figure 47) to hoist as shown in Figure 1-1. 
2.7  Attach the Warning Seal E label, Figure 49, to hoist as shown in Figure 1-1. 
2.8  Attach Nameplate M, Figure 50, to hoist as shown in Figure 1-1. 
 
                      
 
           
Figure 1-1