Справочник Пользователя для Maytag MDG30PNH
14
Maytag Co.
113307 - 7
a. Single-Phase (1ø) Wiring Connections/Hookup
The electrical input connections on ALL single-phase (1ø)
gas dryers are made into the rear service box located at the
upper left area of the dryer.
gas dryers are made into the rear service box located at the
upper left area of the dryer.
Single-Phase Electrical Lead Connections
Black
+
Positive
White or Red
+
Neutral
or L2
Green
+
Ground
A ground lug is provided in the rear electrical box to connect your service ground.
FOR 110V APPLICATIONS
FOR 208-240V APPLICATIONS