Справочник Пользователя для Pelco C3422M-B

Скачать
Страница из 20
2
C3422M-B (3/08)
Preinstallation
NOTE: This manual is designed to be a reference tool for the installation of your system. For best results and ease of 
installation, the dome system should be assembled, pressurized, and tested before installation. A Pressurized Spectra
®
IV 
cable harness (supplied with the back box) is required to test and monitor the pressurized dome.
1. Install the fiber optic module: Open the hinged door to the back box by pushing the tab lock towards the wall of the 
unit and lifting the door open. Remove the plug from the 16-pin connector. Install the module in the 16-pin connector. 
Secure the module to the circuit board standoff using the screw and lock washer provided.
Figure 1.  IInstalling the Fiber Optic Module
2. Connect the back box fiber optic connector to the mating connector on the module. Be sure to route the fiber optic 
cables between the plastic housing and the outer wall of the back box before attaching the two connectors. Follow 
all applicable instructions provided by the manufacturer of the fiber optic module.
NOTE: All bends in the fiber optic cable must be 1-inch diameter or greater.  
Figure 2.  Connecting the Back Box Fiber Optic Connector
16-PIN
CONNECTOR