Справочник Пользователя для Desa Tech GCH480

Скачать
Страница из 54
UNPACKING THE HEATER
1.   Remove heater from carton. 
2.   Remove all protective packaging applied to heater for shipment.
3.   Retain carton and packing material until you confirm the unit operates and is found in good condition.
4.   check heater for any shipping damage. if heater shows any external or internal damage, promptly inform      
      dealer/distributor where you purchased heater.
5.   Remove back cover.
6.   locate the four (4) casters shipped with the unit. There are two (2) locking casters and two 
      non-locking casters. also find the four (4) washers and wrench shipped with the casters.
7.   carefully lay the unit on its back.
8.   place one washer on each of the threaded portions of the caster. (see figure 1).
9.   Thread the casters into the four threaded holes in the base of the unit by turning them 
      clockwise 
. The locking casters should be placed at the front of the unit and the other two
      at the back of the unit. (see figure 1).
10. Tighten The casters using the wrench supplied with the casters.
11. install 20 lb propane cylinder. (see propane supply section)
12. install back cover by inserting the mounting tabs into the slots on the rear flange of the heater.
  
          CAUTION: The casters must be installed onto the unit before it is used. failure to install the 
          casters may result in a fire or explosion causing property damage, personal injury or loss of life.
5
6
FIGURE 1
   washeR
   locKing casTeRs
   non-locKing casTeRs
wRench included wiTh casTeRs 
PROPANE CONSTRUCTION HEATER