Справочник Пользователя для Superior SDVI

Скачать
Страница из 28
22
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Fuel Conversion
Converting your SDVI gas insert between natural gas and LP can be accom-
plished by installing a conversion kit (valve regulator and burner orifice). 
Only a qualified service technician should perform the conversion.
Conversion Kit: Please see instructions provided with conver-
sion kit.
Blower Removal
Unplug the power supply cord from the electrical outlet prior to remov-
ing the blower. The blower can be accessed through the back wall of 
the firebox. 
Remove the insert face, glass door and log set. All of these items are fragile 
so handle them with care. Next, remove the nine allen head screws around 
the outside of the panel fastened to the back wall of the firebox. Rotate the 
top of this panel toward the front, remove the two wires connected to the 
blower, and then lift the panel with the blower attached out of the firebox. 
To reinstall the blower, repeat these steps in the reverse order.
Figure 21
Blower Wiring Schematic
Green (Ground)
Black (Hot)
From Power Source
Speed Control 
White (Neutral)
Black
Blower
White
Blower Snap Switch
Electrical Requirements:
This gas insert operates without an outside power source, however the 
blower requires a 120 Volt electrical service outlet. This appliance, when 
installed, must be electrically grounded in accordance with local codes, 
or in the absence of local codes, the National Electrical Code ANSI/NFPA 
70 - latest edition. (See Operating Options for thermostat and ON/OFF 
switch information).
CAUTION:  Label all wires prior to disconnection when servic-
ing controls. Wiring errors can cause improper and dangerous 
operation. 
ATTENTION:    Au  moment  de  l'entretien  des  commandes, 
étiquetez tous les fils avant de les débrancher.  Des erreurs 
de cáblage peuvent entraîner un fonctionnement inadéquat 
et dangereux.