Справочник Пользователя для Regency P40-NG1

Скачать
Страница из 56
Regency
®
 P40-1 Direct Vent Gas Fireplace
12
INST
ALLA
TION
INSTALLATION
VENTING INTRODUCTION
The  P40  uses  the  "balanced  fl ue"  technology Co Axial system. The 
inner liner vents products of combustion to the outside while the outer 
liner draws outside combustion air into the combustion chamber thereby 
eliminating the need to use heated room air for combustion and losing 
warm room air up the chimney.
Note:  These  fl ue pipes must not be connected to any other 
appliance.
The gas appliance and vent system must be vented directly to the outside 
of the building, and never be attached to a chimney serving a separate solid 
fuel or gas burning appliance. Each direct vent gas appliance must use it's 
own separate vent system. Common vent systems are prohibited.
* For "C" screw position the top facing support is reversed.
Note: For screw position C with a facing material depth of 1-1/4" 
(32mm), the top facing support must be reversed.
UNIT ASSEMBLY PRIOR TO 
INSTALLATION
NOTE: The Top Facing Support, the Side Nailing Strips and the 2 Top 
Standoffs must be correctly positioned and attached before unit is 
slipped into position. 
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a fl at position and must be folded into 
shape and attached.
1)  Remove the standoffs from top of the fi replace.
2)  Take each standoff and bend into the correct shape. Bend up at the 
bend lines until the screw holes in the standoff and the pre-punched 
screw holes on the fi replace  top line up. 
3)  Attach the standoff securely to the top with 2 screws per standoff 
(on opposite corners).
TOP FACING SUPPORT AND SIDE NAILING STRIPS
Determine the total thickness of facing material  to allow the fi nished surface 
to be fl ush with the front of the unit. Total facing thickness can vary from 
1/2" (13mm) to 1-1/4" (32mm) thick. 
The Top Facing Support & Side Nailing Strips can be mounted in 3 different 
positions depending on the thickness of the facing material.
 
1)  Mount Top Facing Support using the 3 supplied screws into the three 
pre-punched screw holes on the top front of the unit. Use hole posi-
tions A, B, or C depending on your facing depth.
2)  Use the same screw hole position for the Side Nailing Strips as was 
used for the Top Facing Support. Attach each side nailing strip using 
3 screws.
Note: When installing side strips into position C, the side strips are not 
reserved.
Screw 
Position
Facing Material Depth
A
1/2" / 13mm
B
7/8" / 22mm
C*
1-1/4" / 32mm
VENT RESTRICTOR POSITION
Vent restriction is required for certain venting installations, see the diagrams 
in the "Venting Arrangements" section to determine if they are required 
for your installation. 
To set the Vent restriction as indicated in the diagrams in the "Venting 
Arrangements" section,  refer to the instructions below;
1)  Remove the top louver if installed.
2)  Loosen the screw on the vent restrictor indicating plate.
3)  Rotate the vent restrictor adjustment rod counter clockwise to line 
up the slot on the indicating plate with the point on the air box to the 
required setting.
4)  Tighten screw to lock position.
Vent Restrictor setting at Set 2
Point on AirBox
Screw
Factory Set Vent Restrictor Setting
(no adjustment required)
Point on AirBox
Vent Restrictor setting at Set 1
Point on AirBox