Regency P121/P121LC/P121RC/P131 Zero Clearance Room Sealed Gas Fireplace
20
Diagram  3
Diagram  5
Diagram  1
Diagram  2
Note: Apply  sealant  "Mill-Pac"  to  inner
pipe  and  high  temperature  sili-
cone sealant to outer pipe on eve-
ry  twist-lock  joint.
VERTICAL
TERMINATION
1) Maintain the 1-1/4" clearances (air
spaces)  to  combustibles  when
passing  through  ceilings,  walls,
roofs,  enclosures,  attic  rafter,  or
other  nearby  combustible  surfac-
es.  Do  not  pack  air  spaces  with
insulation. Check pages 17-19 for
the  maximum  vertical  rise  of  the
flueing  system  and  the  maximum
horizontal offset limitations.
trate the ceiling. Drill a small hole at his point.
Next, drop a plumb bob from the roof to the
hole  previously  drilled  in  the  ceiling,  and
mark the spot where the flue will penetrate
the  roof.  Determine  if  ceiling  joists,  roof
rafters  or  other  framing  will
obstruct  the  flueing  system.
You  may  wish
to  relocate  the
appliance  or  to
offset, 
as
shown  in  Dia-
gram 2 to avoid
cutting  load
bearing  mem-
bers.
3) A Firestop spacer must be installed in the
floor or ceiling of every level. To install the
Firestop spacer in a flat ceiling or wall, cut
a 10 inch square hole. Frame the hole as
shown in Diagram 3 and install the firestop.
4) Assemble the desired lengths of pipe and
elbows.  Ensure  that  all  pipes  and  elbow
connections  are  in  the  fully  twist-locked
position and sealed.
5) Cut a hole in the roof centered on the small
drilled hole placed in the roof in Step 2. The
hole should be of sufficient size to meet the
minimum requirements for clearance to com-
bustibles of 1-1/4". Slip the flashing under
the shingles (shingles should overlap half
the flashing) as per Diagram 4.
    Roof Pitch                  Minimum Vent Height
                                           Feet         Meters
flat to 7/12
2
      0.61
over 7/12 to 8/12
2
0.61
over 8/12 to 9/12
2
0.61
over 9/12 to 10/12
2.5
0.76
over 10/12 to 11/12
3.25
0.99
over 11/12 to 12/12
4
1.22
over 12/12 to 14/12
5
1.52
over 14/12 to 16/12
6
1.83
over 16/12 to 18/12
7
2.13
over 18/12 to 20/12
7.5
2.29
over 20/12 to 21/12
8
2.44
Diagram 4: The upper half of the flashing is
installed under the roofing material and not
nailed down until the chimney is installed.
This  allows  for  small  adjustments.
6) Continue to assemble pipe lengths.
Note: If an offset is necessary in the attic
to  avoid  obstructions,  it  is  impor-
tant  to  support  the  flue  pipe  every
3  feet,  to  avoid  excessive  stress
on  the  elbows,  and  possible  sep-
aration.    Wall  straps  are  available
for  this  purpose  (Diagram  2).
Galvanized pipe is desirable above the roof-
line  due  to  its  higher  corrosion  resistance.
Continue to add pipe sections through the
flashing until the height of the flue cap meets
the minimum height requirements specified in
Diagram 5 or local codes.  Note that for steep
2) Set the gas appliance in
its desired location. Drop
a plumb bob down from
the ceiling to the position
of the appliance flue exit,
and  mark  the  location
where the flue will pene-
Diagram  3
Diagram  4
Diagram  5
to  ensure  that  the  termination  is
not  recessed  into  the  siding.
7) Before connecting the horizontal run of flue
pipe to the flue termination, slide the Wall
Thimble (Part # 942) over the flue pipe.
8) Slide the appliance and flue assembly to-
wards the wall carefully inserting the flue
pipe into the flue cap assembly. It is impor-
tant that the flue pipe extends into the flue
cap sufficient distance so as to result in a
minimum pipe overlap of 1-1/4 inches. Se-
cure the connection between the flue pipe
and the flue cap by attaching the two sheet
metal  strips  extending  from  the  flue  cap
assembly into the outer wall of the flue pipe.
Use the two sheet metal screws provided
to connect the strips to the pipe section. See
Diagram 4.
9) Install wall thimble in the center of the 10"
square and attach with wood screws (Di-
agram 5).
INSTALLATION