Справочник Пользователя для Quadra-Fire CB1200I

Скачать
Страница из 52
Page  20
7014-188B
February 3, 2010
CB1200-I Pellet Insert
B. Outside Air Kit Instructions 
Parts Included in Kit:
  1 piece of 2 inch x 3 ft. flex hose, 
1 hose clamp and 1 rodent screen. 
1.  Measure distance from floor to air vent opening in appli-
ance and mark location on wall.  
2.  Use saw to cut opening in wall. Cut a 2-1/2 to 3 inches 
(64-76mm) opening on inside wall and a 3 to 3-1/2 inch 
(76-89mm) opening on outside of house.
3.  Use hose clamp to secure flex pipe to collar assembly.
4.  Slide trim ring over flex pipe and run pipe through wall.
5.  Attach  hose  to  outside  termination  cap  with  second 
hose clamp.
6.  Secure termination cap to outside surface.
7.  Secure trim ring to interior wall.
Tools Needed:
 Phillips head screw driver; wire cutters; 
hole saw or jig saw.
CAUTION
Never draw outside combustion air from:
•  Wall, floor or ceiling cavity
•  Enclosed space such as an attic or garage
Flex Hose 
Hose Clamp 
Collar 
Assembly 
T rim Rin g 
Hose Clamp 
Termination 
Cap Assembly 
Figure 20.1
Attach hose clamp to 
intake air collar
Outside air 
flex pipe
D. Grille Installation
Figure 20.3
1.  Remove grille from packaging.
2.  Lift top up.  
3.  Align the 3 holes in the insert with the holes in the grille.
4.  Use a Phillips screw driver to secure in place.  It will be 
necessary to go through the hole in the bag support shelf 
to gain access to the screw.  Figure 20.3.
5.  Lower the top into position.
Bag Support Shelf
C. Adjustable Hopper Options
Depending on your installation, the hopper can be vertically 
adjusted up to a maximum of 3-1/2 inches (89mm) and will 
hold an additional 15 lbs of fuel.
To adjust hopper:
1.  Using a Phillips head screw drive, remove all the screws 
from the top of the hopper securing the top hopper piece 
to the bottom hopper piece and insert body.
2.  Adjust upward a maximum of 3-1/2 inches (89mm).
3.  Mark location for new holes and drill new holes.
4.  Secure hopper pieces together using screws removed in 
step one.
5.  See drawing on page 8, Figure 8.3.
Figure 20.2