Справочник Пользователя для Toshiba RAS-M18EAV-E

Скачать
Страница из 136
– 26 –
7.  REFRIGERANT CYCLE DIAGRAM
7-1. Refrigerant Cycle Diagram
RAS-B13EKVP-E, RAS-B10EKVP-E
RAS-M14EAV-E
NOTE :
Gas leak check position
Refrigerant flow (Cooling)
Refrigerant flow (Heating)
INDOOR UNIT
T1
Tca
TO
Temp. measurement
To B room
To B room
Indoor heat
exchanger
Indoor fan
Deoxidized copper pipe
Both A and B rooms
  Outer dia. : 6.35mm
  Thickness : 0.8mm
Sectional shape
of heat insulator
Allo
w
a
b
le height
diff
erence :
 10m
Allo
w
a
b
le pipe length
P
      Pressure measurement
Gauge attaching port
Vacuum pump connecting port
Capillary
Ø2.2 x 200
Capillary
Ø2.2 x 200
Pulse motor
valve at liquid side
(CAM-B22YGTF-2)
Td
TGa
TGb
4-way valve
(STF-0108Z)
Compressor
DA111A1F-20F1
TS
T2
Outdoor heat 
exchanger
Temp. measurement
Propeller fan
Refrigerant amount : 0.90kg
OUTDOOR UNIT
Muffler
Muffler
TE
Strainer
Deoxidized copper pipe
Both A and B rooms
  Outer dia. : 9.52mm
  Thickness : 0.8mm
Ta
Per 1 unit
Max.: 20m
Total: 30m
Chargeless
   = 20m
Charge 
   = 20g/m 
 (21 to 30m)
*1
*1 The TC sensor is at the center of the indoor unit’s heat exchanger.
NOTE :
• The maximum pipe length of this air conditioner is 30m. When the pipe length exceeds 20m, the additional
charge of refrigerant, 20g per 1m for the part of pipe exceeded 20m is required (Max. 200g)