Справочник Пользователя для Toshiba RAV-SP1404ATZ-E

Скачать
Страница из 162
– 147 –
No.
„
Part name
Replacement of
electric parts
Procedure
1. Control P.C. board
1) Carry out work of 1 of 

.
X
 WARNING
X
Never disassemble the inverter for
1 minute after power supply has been
turned off because an electric shock may
be caused.
2) Remove the connectors connected to
the control P.C. board. (Indoor power
supply, Temperature sensor, PMV coil,
4-way valve coil, Compressor case
thermo, Fan motor)
• Unlock the lock of the housing part
and then remove the connectors.
3) Remove the lead wires connected to
the control P.C. board.
Compressor lead U: CN200 Red
V: CN201 White
W: CN202 Black
Reactor cord
CN05 White
CN06 White
4) Remove the earth wire from the control
P.C. board.
(Trust B tight screw Ø4 × 6, 1 pc.)
5) Remove the fixing screws of the control
P.C. board. (Screw with collar for fixing
element Ø3 × 16, 9 pcs. Pan S tight
screw for fixing board Ø3 × 20, 1 pc.)
6) Remove the control P.C. board.
(Supporter: 5 positions)
NOTE :
Be careful to take out because there is
sealing material for the heat sink.
7) Replace the control P.C. board with a
new one.
NOTE :
• Be sure not to confuse for Compressor
lead V (CN201 White), Reactor lead
CN05 and CN06.
• Be sure not to come-off of the
insulating sheet.
Remarks
Control P.C. board
Compressor 
case thermo.
Upper fan motor
Reactor lead
Compressor lead
Earth wire
Lower 
fan motor
Temperature 
sensor
Compressor lead
Earth wire
Lower 
fan motor
Temperature 
sensor
4-way valve coil
4-way valve coil
PMV coil
Indoor power supply
P.C. board 
fixing screw
Insulating sheet
Control P.C. board
Sealing material
Element fixing screws 
(9 positions)