GOLD CGi Gas-Fired Water Boiler — Boiler Manual
0
Part Number 550-110-710/0107
Water piping — general information
4a
General piping information
If installation is to comply with ASME or Canadian requirements, an ad-
ditional
high temperature limit
is needed. Install control in supply piping
between boiler and isolation valve. Set second control to minimum 0°F
above setpoint of first control. Maximum allowable setpoint is 40°F. See
Section
9b
for wiring.
A
low water cutoff device
is required when boiler is installed above ra-
diation level or by certain state or local codes or insurance companies. Use
low water cutoff designed for water installations. Electrode probe-type is
recommended. Purchase and install in tee in supply piping above boiler.
Use
  backflow  check  valve
 in  cold  water  supply  as  required  by  local
codes.
Pressure/temperature gauge
Install pressure/temperature gauge in tee on supply piping (as shown in
drawing on page 3).
Relief valve
Install relief valve vertically in ¾” tapping on side of boiler. See
Figure 16 
or
 17
, page 1, and the tag attached to the relief valve for manufacturer’s
instructions.
Table 6  Water pipe size (based on 20°F rise)
Circulator
The circulator is shipped loose (wiring pre-attached to
boiler) to allow you to locate it either in the return or
supply piping, as desired. See page 3 for a typical instal-
lation. Pipe the expansion tank to the suction side of the
circulator whenever possible. Install an air separator in
the supply piping. Connect the expansion tank to the air
separator only if the separator is on the suction side of
the circulator. Always install the system fill connection
at the same point as the expansion tank connection to
the system.
Figures 16
and
17
show typical near-boiler
piping connections.
System water piping
See
Figure 16
 (diaphragm-type or bladder-type expan-
sion tank) or 
Figure 17
 (closed-type expansion tank)
and
Table  6
, for  near-boiler  and  single-zone  systems
designed for return water at least 130°F.
See pages -3 to complete multiple-zone piping or
pages  4-9  to  complete  piping  for  radiant  heating
systems  or  converted  gravity  systems  (large-volume
systems originally designed for circulation by natural
convection rather than a pump). See page 9 for boilers
used with refrigeration systems.
Chillers or air handling units
:
Install boiler such that —
•  Chilled medium, if used, is piped in parallel with
heating  boiler.  Use  appropriate  valves  to  prevent
chilled  medium  from  entering  boiler.  Consult
I=B=R Installation and Piping Guides.
•  If  boiler  is  connected  to  heating  coils  located  in
air  handling  units  where  they  can  be  exposed  to
refrigerated air, use flow control valves or other au-
tomatic means to prevent gravity circulation during
cooling cycle. Circulation of cold water through the
boiler could result in damage to the heat exchanger,
causing  possible  severe  personal  injury,  death  or
substantial property damage.
To avoid water damage or scalding due to relief valve
operation:
•  Discharge line must be connected to relief valve outlet and
run to a 
safe place of disposal
. Terminate the discharge line to eliminate
possibility of severe burns should the valve discharge.
•  Discharge line must be as short as possible and be the
same size as 
the valve discharge connection
 throughout its entire length.
•  Discharge line must
pitch downward
from the valve and terminate
at least 6” above the floor drain where any discharge will be clearly
visible.
•  The discharge line shall
terminate plain, not threaded
, with a mate-
rial serviceable for temperatures of 35°F or greater.
• 
Do not pipe the discharge to any place where freezing could 
occur.
• 
No shutoff valve
shall be installed between the relief valve and boiler,
or in the discharge line. Do not plug or place any obstruction in the
discharge line.
• 
Failure to comply
with the above guidelines could result in failure of
the relief valve to operate, resulting in possibility of severe personal
injury, death or substantial property damage.
• 
Test the operation of the valve
after filling and pressurizing system
by lifting the lever. Make sure the valve discharges freely. If the valve
fails to operate correctly, replace it with a new relief valve.
Boiler
model number
To
system
From
system
CGi-25
¾"
¾"
CGi-3, 4, 5
1"
1"
CGi-6, 7
1¼"
1¼"
CGi-8
1½"
1½"
Note: The boiler supply and return connections, the return/ 
drain tee and the supply/gauge tee supplied with the 
boiler are 1¼” NPT. One of the circulator flanges sup-
plied with the boiler is 1¼”. The other circulator flange 
is the size of the recommended system piping shown 
above.