A.
  Design and install boiler and system piping to 
prevent oxygen contamination of boiler water and 
frequent water additions.
1.  There are many possible causes of oxygen 
contamination such as:
a.  Addition of excessive make-up water as a result 
of system leaks.
b.  Absorption through open tanks and fittings.
c.  Oxygen permeable materials in the distribution 
system.
2.  In order to insure long product life, oxygen sources 
must be eliminated.  This can be accomplished by 
taking the following measures:
a.  Repairing system leaks to eliminate the need for 
addition of make-up water.
b.  Eliminating open tanks from the system.
c.  Eliminating and/or repairing fittings which allow 
oxygen absorption.
d.  Use of non-permeable materials in the 
distribution system.
e.  Isolating the boiler from the system water by 
installing a heat exchanger.
f.  Use properly designed and operating air 
elimination devices in water piping.
B.
  Low Water Cut Off (LWCO) on Hot Water Boilers 
(Optional)
WARNING
DO NOT ATTEMPT to cut factory wires to 
install an aftermarket low Water Cut Off 
(LWCO).  Only use connections specifically 
identified for Low Water Cut Off.
In all cases, follow the low Water Cut Off 
(lWCO) manufacturer’s instructions.
 
   
When
 
A low water cutoff is required to protect a hot water 
boiler when any connected heat distributor (radiation) 
is installed below the top of the hot water boiler (i.e. 
baseboard on the same floor level as the boiler).  In 
addition, some jurisdictions require the use of a LWCO 
with a hot water boiler.
IV.  Water Piping and Trim
 
   
Where
 
The universal location for a LWCO on both gas and oil 
hot water boilers is above the boiler, in either the supply 
or return piping.  The minimum safe water level of a 
water boiler is at the uppermost top of the boiler; that is, 
it must be full of water to operate safely.
 
   
What Kind
 
The SCG boiler is designed to accept the wiring of the 
Safgard Model 1100-H4 (P/N 100592-01) LWCO.  This 
is a probe type LWCO.  The factory wiring is designed 
to allow simple “Plug-in” installation of the wiring.
 
   
How to Pipe
 
A “tee” is commonly used to connect the probe LWCO 
to the supply or return piping, as shown below.
lWCO location
 
Select the appropriate size tee using the LWCO 
manufacturer’s instructions.  Often, the branch 
connection must have a minimum diameter to prevent 
bridging between the probe and the tee.  Also, the run 
of the tee must have a minimum diameter to prevent 
the end of the probe from touching or being located too 
close to the inside wall of the run of the tee.
 
Ideally, manual shutoff valves should be located 
above the LWCO and the boiler to allow for servicing.  
This will allow probe removal for inspection without 
draining the heating system.  Many probe LWCO 
manufacturers recommend an annual inspection of the 
probe.
WARNING
Failure to properly pipe boiler may result in improper operation and damage to boiler or structure.
Oxygen contamination of boiler water will cause corrosion of iron and steel boiler components, and 
can lead to boiler failure.  Burnham’s Standard Warranty does not cover problems caused by oxygen 
contamination of boiler water or scale (lime) build-up caused by frequent addition of water.