Справочник Пользователя для Burnham 1099-01R1-/10

Скачать
Страница из 8
User Maintenance
A.
 General Housekeeping (Continuous).
1.  Keep boiler area clear and free of combustible
materials and obstructions to the free flow of 
combustion and ventilation air to the boiler.
2.  Do not store or use gasoline, other flammable 
vapors, liquids or sources of hydrocarbons in the 
vicinity of the boiler or any other appliance.
3.  Do not store or use halogen-containing products
(bleaches, cleaners, fabric softeners, refrigerants, 
chemicals, etc.) in the vicinity of the boiler. 
B.
 Inspect Inlet Air and Vent System (Monthly). Check
the following. If corrective action is required contact 
qualified service agency.
1.  Blocked vent switch must be attached to the canopy.
2.  Vent pipe must be full round shape, showing no 
damage from impact or excessive temperature.
3.  All vent pipe joints must be secure.
4.  Horizontal runs must not sag.
5.  The vent system must be free of corrosion and other 
deterioration.
6.  Supports must not be loose or broken.
C.
Inspect Pilot and Main Burner Flames (Monthly).
1.  Remove jacket front panel. 
2.  View flames through burner access panel.  See 
Figure 1.
3.  Adjust thermostat to highest setting.
4.  Check pilot flame. See Figure 4. The pilot produces 
a single flame. The flame should be steady, medium 
hard blue enveloping 
3
/
8
to ½ inch of sensing probe.
If flame is yellow and lazy, follow instructions TO 
TURN OFF GAS TO APPLIANCE (see Figure 2), 
and contact qualified service agency.
5.  Check main burner flames. See Figure 5. Flame 
should have clearly defined inner cone with no 
yellow tipping. Orange-yellow streaks caused 
by dust should not be confused with true yellow 
tipping. If yellow flames are observed, follow 
instructions TO TURN OFF GAS TO APPLIANCE 
(see Figure 2), and contact qualified service agency.
6.  Adjust thermostat to normal setting.
D.
 S
chedule Inspection by Qualified Service Agency 
(Annual or at Beginning of Heating Season). For
continued safe operation a qualified service agency 
must provide a more detailed inspection of burners, heat 
exchanger and vent system, and provide maintenance 
as specified in Installation, Operating and Service 
Instructions.
WARNING
Service on this boiler should be undertaken only by trained and skilled personnel from a qualified service agency. 
Inspections should be performed at intervals specified in Installation, Operating and Service Instructions and this 
manual. Maintain manuals in a legible condition.
Keep boiler area clear and free of combustible materials, gasoline and other flammable vapors and liquids.
Do not place any obstructions in boiler room that will hinder flow of combustion and ventilation air.