Справочник Пользователя для Lopi 028-S-75-2

Скачать
Страница из 40
Stove Installation 
(for qualified installers only)
17
© Travis Industries
100-01177
4060802
Hearth Stove
Positive
Connection
NOTE:
Most factory-built
chimney manufacturers
make stainless steel
chimney liners, either
flexible or rigid.  This
provides a wide variety
of installation options.
Make sure to follow the
manufacturer's
instructions for
installation and support.
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
A
A
A
A
A
A
A
Remove damper 
or wire it open
Airtight Insulated 
Clean-Out
Min. 36" 
Combustible 
Mantle
NOTE: The entire fireplace and 
chimney must be clean, undamaged, 
and meet all local building codes 
(UBC, etc.).  Damage must be 
repaired prior to installation.  The 
chimney must be 15' to 33' tall.
Floor Protection
(See the section 
"Floor Protection 
Requirements" 
for more details)
See the section 
"Stove Placement 
Requirements" for 
minimum clearances 
required.
AA
The liner must be 
stainless steel connector 
or flexible vent.  Follow 
the liner manufacturer's 
instructions for installation 
and support.
Cap and flashing 
prevents water from 
entering
Figure 15
Hearth Stove Direct
Connection
NOTE:
Direct connections require
installation of an airtight,
non-combustible block-off
plate or damper adapter.
AAA
AAA
AAA
AAA
AAA
AAA
AAA
A
A
A
A
A
Block-off plate or 
damper adapter 
Remove damper 
or wire it open
Airtight 
Insulated 
Clean-Out
Stainless steel 
chimney connector 
must Extend 1' past 
the block-off plate or 
to the flue liner  
NOTE: The chimney must have a clay 
tile liner.  If it does not, the installation 
must use a positive connection (full 
reline).  The entire fireplace and 
chimney must be clean, undamaged, 
and meet all local building codes (UBC, 
etc.).  Damage must be repaired prior 
to installation.  The chimney must be 
15' to 33' tall.
Clay 
Liner
Floor Protection
(See the section "Floor 
Protection Requirements" 
for more details)
Combustible Mantle
Min. 36" 
See the section 
"Stove Placement 
Requirements" for 
minimum clearances 
required.
Figure 16