water heater installation
than 1/2 inch PVC in size.
3. 
do not remove, modify or alter the factory condensate trap.
installation instructions
1.  Ensure the water heater’s on/off switch is in the “off” position.
2.  install  a  1/2  inch  PVC  condensate  drain  line  between  the 
condensate drain connection on the Condensate Drain Trap 
3.  Terminate the condensate drain piping with an elbow above 
the drain. Ensure that any discharge will exit the condensate 
drain line no more than 6 inches (15.2 cm) above a suitable 
building drain, or external to the building, see Figure 50.
note: in cold climates it is recommended the condensate 
drain be terminated at a suitable drain inside the building.
4.  Ensure the condensate drain line is not elevated above the 
5.  Brace the condensate drain line with floor mounted standoffs 
every three feet.
6.  Ensure  the  condensate  drains  freely  during  start  up,  see 
condensate drain installation
installation  must  conform  with  these  instructions  and  local 
building codes.
Field supplied materials required for installation include:
•  Approved PVC cement and PVC primer.
•  1/2 inch PVC pipe - minimum length to equal the distance  
between the water heater and a suitable building drain.
•  1/2 inch PVC fittings (elbows and couplings) necessary to 
install a condensate drain line between the Condensate 
Drain Trap Assembly and a suitable building drain.
•  Floor mounted standoffs to brace the drain line.
installation notes
1.  The condensate drains from the water heater’s covered by 
this instruction have PH levels between 4.3 and 5.0. install 
a commercially available neutralizing kit if required by local 
codes. Lower PH levels are acidic. Do not connect a metal 
condensate  drain  line,  such  as  copper  pipe,  to  the  water 
heater for this reason.
2.  The  field  installed  condensate  drain  line  must  not  be  less 
CONDENSATE DRAIN
LINE - FIELD INSTALLED
DRAIN LINE TO
TERMINATE NO
MORE THAN 6
INCHES (15.2 cm)
ABOVE DRAIN
BUILDING
DRAIN
FACTORY INSTALLED
CONDENSATE TRAP
CLEANOUT PLUG SHOULD
FACE TOWARDS THE FRONT
OF THE WATER HEATER FOR
SERVICE ACCESS
EXHAUST (VENT)
ELBOW
CONDENSATE TRAP DETAIL
PVC PIPE PLUG
1 ¼” NPT
CLEANOUT PIPE
PLUG SHOULD
BE ORIENTED TO
THE FRONT OF THE
WATER HEATER FOR
SERVICE ACCESS
PVC BUSHING
1 ½” SLIP x 1 ¼” NPT
PVC BUSHING
1 ½” SLIP x ½” SLIP
PVC TEE FITTING
1 ½” SLIP x 1 ½” SLIP x ½” NPT
PVC PIPE NIPPLE
½” NPT
½” PVC 90° ELBOW
CONDENSATE DRAIN
CONNECTION. FIELD
INSTALLED DRAIN
LINE CONNECTS HERE
½” PVC 90° 
STREET ELBOW
½” PVC PIPE NIPPLE
figure 50