Справочник Пользователя для State Industries SUF-60-120

Скачать
Страница из 80
58
seQuence of operation
read  the  Sequence  of  Operation  below  before  attempting  to 
correct  any  operational  problems.  refer  to  the  Features  And 
Components  section  beginning  on  page  7  for  the  location  of 
various  water  heater  components  described  below.  See  the 
Sequence Of Operation Flow Chart on page 59 also.
1.  When the control system is first powered, during boot up, it will 
display water heater model information during initialization. 
After a few moments the control system LCD which is part 
of  the  Uim  (user  interface  module)  will  display  the  default 
screen known as the "Desktop" screen.
2.  if  the  control  system  determines  that  the  actual  water 
temperature  inside  the  tank  is  below  the  programmed 
Operating Set Point minus the Differential setting, a heating 
cycle is activated.
3.  The control system then performs selected diagnostic system 
checks.  This  includes  confirming  the  low  gas  pressure, 
blocked  exhaust,  blocked  intake  and  ECO  (energy  cut 
out) switch contacts are closed. The Blower Prover Switch 
contacts are confirmed open.
4.  if all diagnostic checks are successfully passed, the control 
system energizes the Combustion Blower for pre-purge.
5.  The control system must confirm the Blower Prover Switch 
contacts close after the Combustion Blower is energized.
6.  if  the  Blower  Prover  Switch  contacts  are  confirmed  closed 
the control system energizes the Hot Surface igniter for the 
igniter warm-up period.
7.  The  control  system  monitors  the  igniter  current  and  must 
sense a minimum of 2.0 AC amps during the igniter warm up 
period (12-17 seconds).
8.  if  igniter  amperage  is  confirmed  at  or  above  the  required 
minimum the control system energizes the 24 Volt Gas Valve 
allowing gas to flow to the main Burner. 
9.  The control system de-energizes the Hot Surface igniter.
10. The control system monitors the flame sensor to confirm a 
flame is present at the main Burner. if a flame is not verified 
during the ignition trial period the control system will try for 
ignition up to two more times. if flame can not be verified after 
three trials for ignition, the control system will lock out and 
display the “ignition Failure” Fault message.
11. if  a  flame  is  verified,  the  control  system  will  enter  the 
heating mode where it will continue heating the water until 
the Operating Set Point is reached. At this point, the control 
system will de-energize the 24 Volt Gas Valve and enter the 
post-purge cycle (approximately 30 seconds).
12. The Combustion Blower will run for the duration of the post-
purge  cycle  to  purge  the  water  heater  of  all  combustion  
gases. When the post-purge cycle is complete, the blower is 
de-energized and will coast to a stop.
13. The  control  system  now  enters  the  standby  mode  while 
continuing  to  monitor  the  internal  storage  tank  water 
temperature  and  the  state  of  other  system  devices.  if  the 
tank temperature drops below the Operating Set Point minus 
the Differential setting, the control will automatically return to 
Step 2 and repeat the operating cycle.
troubleshooting
installation checklist
The list below represents some of the most critical installation 
requirements that, when overlooked, often result in operational 
problems,  down  time  and  needless  parts  replacement.  This 
is  not  a  complete  list.  Before  performing  any  troubleshooting 
procedures  use  the  list  below  to  check  for  installation  errors. 
Costs  to  correct  installation  errors  are  not  covered  under  the 
limited  warranty.  Ensure  all  installation  requirements  and 
instructions in this manual have been maintained and followed.
water heater location
1.  Ensure  proper  clearances  to  combustibles  are  maintained 
and there is sufficient room to service the water heater. See 
2.  Ensure the area is free of corrosive elements and flammable 
Venting
3.  Ensure the intake air and/or vent (exhaust) piping is the correct 
size for the installed length. See Venting requirements on 
4.  Ensure the maximum equivalent feet of pipe has not been 
exceeded for the intake air and/or vent pipe. See Table 7 on 
5.  Ensure  the  maximum  number  of  elbows  has  not  been 
exceeded  in  the  intake  air  and/or  vent  pipe.  See  Venting 
6.  Ensure  the  intake  air  screen  has  been  removed  from  the 
intake air connection on the water heater when installing the 
water  heater  in  a  Direct  Vent  configuration.  See  Figure  19 
7.  Ensure  all  exterior  clearances  for  the  intake  air,  vent  and 
concentric  terminations  are  maintained.  See  Vertical 
on page 30. These clearances and those cited by local and 
national codes must be maintained.
gas supply and piping
8.  Ensure a supply gas regulator has been installed for each 
water  heater.  See  the  requirements  for  a  Supply  Gas 
9.  Ensure  the  supply  gas  line  to  each  water  heater  meets 
the  minimum  supply  gas  line  size  requirements.  See  the 
requirements for the Supply Gas Line on page 14 and the 
condensate drain
10. Ensure  the  condensate  drain  is  properly  connected  to  the 
exhaust elbow on the water heater and draining freely to a 
electrical connections
11. Ensure the power supply connections to the water heater are 
polarity correct. See the requirements for the Power Supply 
12. Ensure the water heater is properly grounded. Flame sensing 
requires an adequate earth ground. if the water heater is not 
properly grounded it will cause ignition Failure.