Справочник Пользователя для Rheem Solar Loline Conversion Kit Electric Wter Heater

Скачать
Страница из 40
INSTALLATION – SOLAR CONTROL UNIT 
 
24 
The solar control unit is designed to be mounted on the side of the solar storage 
tank, with its location above and offset from the cold water inlet. The solar control 
unit, supplied with a 1.8 metre power cord, requires a 220 – 240 V general power 
outlet (GPO) located within 1.2 metres of its installation. If the installation is 
outdoors, the power outlet must be weatherproof (refer to “Connections – Electrical” 
on page 32). 
 
Note: Care must be taken when mounting the solar control unit to the side of the 
solar storage tank. Damage to the cylinder as a result of mounting the solar control 
unit to the jacket will void the warranty (refer to “Saddling - Pipe Work” on page 20). 
 
SOLAR CONVERSION OF A RHEEM ELECTRIC WATER HEATER 
To connect the solar cold and hot pipes and mount the solar control unit on a 
Rheem electric water heater (without a raised solar hot inlet): 
 
Numbers in parentheses refer to items on diagram on page 26. 
· 
Fit the 5 way tee (2) to the cold water inlet of the solar storage tank. Ensure 
the rounded tube (snorkel) is orientated upwards when inserted into the solar 
storage tank, the cold sensor housing is orientated horizontally to the front of 
the solar storage tank and the solar cold outlet is orientated vertically upwards. 
· 
Connect the DN15 preformed pipe (4) to the solar cold outlet connection, using 
the compression nut (5) and olive (6) provided. 
· 
Fit a BSP½” x G½” nipple (1) to the outlet of the circulator (7) in the solar 
control unit (8) (ensure the compression end of the nipple is exposed). 
· 
Locate the solar control unit (8) by connecting the DN15 preformed pipe (4) to 
the nipple on the inlet of the circulator (7) using the compression nut (5) and 
olive (6) provided. 
· 
Secure the solar control unit (8) to the solar storage tank using the four 
screws (9) provided. 
· 
Connect the solar cold pipe (to the collector) to the nipple (1) on the outlet side 
of the circulator (7) using the compression nut (5) and olive (6) provided. 
· 
Insert the cold sensor probe (10) into the cold sensor housing on the 5 way 
tee (2), ensuring the ‘O’ ring is in position on the probe. Lock it into position 
with the locking washer and clip provided. 
· 
Connect the hot sensor lead (from the solar collector installation) to the hot 
sensor cable connector at the underside of the solar control unit (8).