Справочник Пользователя для Graco 257100

Скачать
Страница из 32
Prime Pump 
10
3A0245B
Prime Pump
1.
Mix material in separate bucket.
2.
Add 1-2 gallons (4-8 liters) of material to hopper.
3.
Place prime hose deflector into hopper or empty 
bucket. NOTE: Keep deflector shield wet once it is in 
use.
4.
Turn power ON and turn prime valve handle to 
PRIME. Turn flow control knob clockwise to start 
pumping.
5.
Install material screen (P).
6.
Add the remaining material to hopper. 
7.
After unit is primed, turn prime valve handle to 
APPLY FINISH position.
NOTICE
Do not use with quick-set materials. They can harden 
inside the unit and hose.
ti15747a
ti15613a
ti8794a
ti15746a
ti11670a
ti15612a